The Gravity Recovery and Interior Laboratory (GRAIL) was an American lunar science mission in NASA's Discovery Program which used high-quality gravitational field mapping of the Moon to determine its interior structure. The two small spacecraft, GRAIL A (Ebb) and GRAIL B (Flow), were launched on 10 September 2011 aboard a single launch vehicle: the most-powerful configuration of a Delta II, the 7920H-10. GRAIL A separated from the rocket about nine minutes after launch, GRAIL B followed about eight minutes later. They arrived at their orbits around the Moon 25 hours apart. The first probe entered orbit on 31 December 2011 and the second followed on 1 January 2012. The two spacecraft impacted the lunar surface on December 17, 2012.
Overview
Maria Zuber of the Massachusetts Institute of Technology was GRAIL's principal investigator. NASA's Jet Propulsion Laboratory managed the project. NASA budgeted US$496 million for the program to include spacecraft and instrument development, launch, mission operations, and science support. Upon launch the spacecraft were named GRAIL A and GRAIL B and a contest was opened to school children to select names. Nearly 900 classrooms from 45 states, Puerto Rico and the District of Columbia, participated in the contest. The winning names, Ebb and Flow, were suggested by fourth grade students at Emily Dickinson Elementary School in Bozeman, Montana. Each spacecraft transmitted and received telemetry from the other spacecraft and Earth-based facilities. By measuring the change in distance between the two spacecraft, the gravity field and geological structure of the Moon was obtained. The two spacecraft were able to detect very small changes in the distance between one another. Changes in distance as small as one micrometer were detectable and measurable. The gravitational field of the Moon was mapped in unprecedented detail.
Objectives Map the structure of the lunar crust and lithosphere Understand the asymmetric thermal evolution of the Moon Determine the subsurface structure of impact basins and the origin of lunar mass concentrations (mascons) Ascertain the temporal evolution of crustal brecciation and magmatism Constrain the deep interior structure of the Moon Place limits on the size of the Moon's inner core The data collection phase of the mission lasted from 7 March 2012 to 29 May 2012, for a total of 88 days. A second phase, at a lower altitude, of data collection began 31 August 2012, and was followed by 12 months of data analysis. On 5 December 2012 NASA released a gravity map of the Moon made from GRAIL data. The knowledge acquired will aid understanding of the evolutionary history of the terrestrial planets and computations of lunar orbits.
Spacecraft
Instruments
Ka band Lunar Gravity Ranging System (LGRS), derived from the Gravity Recovery and Climate Experiment (GRACE) instrument. 90% of the GRACE software was reused for GRAIL. Radio science beacon (RSB) Moon Knowledge Acquired by Middle school students (MoonKAM). Each MoonKAM system (one per spacecraft) consists of a digital video controller and four camera heads.
Propulsion Thrusters aboard each spacecraft were capable of producing 22 newtons (4.9 lbf). Each spacecraft was fueled with 103.5 kilograms (228 lb) of hydrazine, to be used by the thrusters and the main engine to enable the spacecraft to enter lunar orbit and transition to the science phase of its mission. The propulsion subsystem consisted of a main fuel tank and a helium-repressurization system which was activated shortly after lunar orbit insertion.
Mission profile
Launch attempts All times are in North American Eastern Daylight Time (EDT; UTC−4).
Transit phase
Unlike the Apollo program missions, which took three days to reach the Moon, GRAIL made use of a three- to four-month low-energy trans-lunar cruise well outside the Moon's orbit and passing near the Sun-Earth Lagrange point L1 before looping back to rendezvous with the Moon. This extended and circuitous trajectory enabled the mission to reduce fuel requirements, protect instruments and reduce the velocity of the two spacecraft at lunar arrival to help achieve the extremely low 50 km (31 mi) orbits with separation between the spacecraft (arriving 25 hours apart) of 175 to 225 km (109 to 140 mi). The very tight tolerances in the flight plan left little room for error correction leading to a launch window lasting one second and providing only two launch opportunities per day.
Science phase The primary science phase of GRAIL lasted for 88 days, from 7 March 2012 to 29 May 2012. It was followed by a second science phase that ran from 8 Aug 2012 into early Dec 2012. The gravity mapping technique was similar to that used by Gravity Recovery and Climate Experiment (GRACE), and the spacecraft design was based on XSS-11. The orbital insertion dates were December 31, 2011 (2011-12-31) (for GRAIL-A) and January 1, 2012 (2012-01-01) (for GRAIL-B). The initial lunar orbits were highly elliptical near-polar, and were later lowered to near-circular at about 25-86 km altitude with a period of about 114 minutes. The spacecraft were operated over the 88-day acquisition phase, divided into three 27.3 day long nadir-pointed mapping cycles. Twice each day there was an 8-hour pass in view of the Deep Space Network for transmission of science and "E/PO MoonKam" data. The first student-requested MoonKam images were taken by Ebb from 2012 March 15–17 and downlinked to Earth March 20. More than 2,700 schools spanning 52 countries were using the MoonKAM cameras.
Flow's MoonKam camera captured the Lunar Reconnaissance Orbiter (LRO) as it flew by at a distance of about 12 miles (20 km) on May 3. It is the first footage of a moon-orbiting robotic spacecraft taken by another one.
Terminal phase
… excerpt ends here. Continue reading the full article.




![GRAIL: Fourth-grade students at Emily Dickinson Elementary School in Bozeman, Montana, who suggested the names Ebb and Flow[7]](https://upload.wikimedia.org/wikipedia/commons/thumb/c/cf/Ebb_and_flow.jpg/330px-Ebb_and_flow.jpg?utm_source=en.wikipedia.org&utm_campaign=parser&utm_content=thumbnail)

