ArticleslgStudy

physics

Genesis Solar Energy Project

Genesis Solar Energy Project is a physics topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Genesis Solar Energy Project rather than just read about it. In short: The Genesis Solar Energy Project is a concentrated solar power station located in the Mojave Desert on 1,920 acres (780 ha) of Bureau of Land Management land, in eastern Riverside County, California. The plant is owned/managed by Genesis Solar, LLC, a subsidiary of NextEra Energy Resources, LLC.

Genesis Solar Energy Project — main illustration
Genesis Solar Energy Project — illustration

Key takeaways

  • Genesis Solar Energy Project belongs to physics; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Genesis Solar Energy Project to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Genesis Solar Energy Project from memory before moving on to harder problems.

Reference excerpt

The Genesis Solar Energy Project is a concentrated solar power station located in the Mojave Desert on 1,920 acres (780 ha) of Bureau of Land Management land, in eastern Riverside County, California. The plant is owned/managed by Genesis Solar, LLC, a subsidiary of NextEra Energy Resources, LLC. The Genesis Solar Energy Project is located about 25 miles (40 km) west of Blythe, in the Lower Colorado River Valley. The plant was built in the Colorado Desert along an ancient trade route that native people had traveled for thousands of years. The route traversed the Sonoran Desert and enabled trade between the Colorado River and the coast. The solar power plant consists of two independent 125 MW net (140 MW gross) sections, using solar trough technology. This was one of three of the world's largest solar plants, that began supplying power in 2013 and 2014, located in the deserts of Riverside and San Bernardino counties. The Project power block and solar arrays occupy about 1,360 acres (550 ha) of the site. The rest are the evaporation ponds, access road, administration buildings and some fenced open area. The 1840 Solar Collector Assemblies are 1,048 square metres (11,280 sq ft) each, yielding 1,928,320 square metres (20,756,300 sq ft) of total solar aperture. A June 2014 report details the project's potential impact on bird populations.

Production Genesis Solar Energy Project's production is as follows (MWh).

Maximum production was estimated at 580,000 MW·h per year.

See also

Solar power plants in the Mojave Desert List of solar thermal power stations

References

External links Nexteraenergyresources.com: Genesis Solar Energy Project — (redesign factsheet)

Illustrations

Genesis Solar Energy Project illustration

Worked examples

Example 1 — a first encounter with Genesis Solar Energy Project

Start with the simplest possible case. Write down what Genesis Solar Energy Project claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In physics, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Genesis Solar Energy Project before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Genesis Solar Energy Project ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Genesis Solar Energy Project

In research
Genesis Solar Energy Project appears in physics research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Genesis Solar Energy Project in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Genesis Solar Energy Project is common in secondary-school and first-year university syllabi. It links to neighbouring topics 2014 establishments in California, Buildings and structures in Riverside County, California, Energy in Riverside County, California, so understanding it makes those chapters shorter.
In everyday life
Look for Genesis Solar Energy Project outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Genesis Solar Energy Project in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Genesis Solar Energy Project means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Genesis Solar Energy Project out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Genesis Solar Energy Project in simple terms?

The Genesis Solar Energy Project is a concentrated solar power station located in the Mojave Desert on 1,920 acres (780 ha) of Bureau of Land Management land, in eastern Riverside County, California. The plant is owned/managed by Genesis Solar, LLC, a subsidiary of NextEra Energy Resources, LLC.

Why does Genesis Solar Energy Project matter?

Because it connects several physics ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Genesis Solar Energy Project?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Genesis Solar Energy Project.

Tags

  • 2014 establishments in California
  • Buildings and structures in Riverside County, California
  • Energy in Riverside County, California
  • Energy infrastructure completed in 2014
  • Lower Colorado River Valley
  • NextEra Energy
  • Solar power in the Mojave Desert
  • Solar power stations in California
  • Solar thermal energy

Keep exploring