ArticleslgStudy

physics

Gran Gasoducto del Sur

Gran Gasoducto del Sur is a physics topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Gran Gasoducto del Sur rather than just read about it. In short: The Gran Gasoducto del Sur (also known as Venezuela-Argentina Gas Line) was a proposed 8,000–15,000-kilometer (5,000–9,300 mi) long natural gas pipeline to connect Venezuela, Brazil and Argentina. The overall project cost was expected to be around US$17-23 billion.

Gran Gasoducto del Sur — main illustration
Gran Gasoducto del Sur — illustration

Key takeaways

  • Gran Gasoducto del Sur belongs to physics; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Gran Gasoducto del Sur to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Gran Gasoducto del Sur from memory before moving on to harder problems.

Reference excerpt

The Gran Gasoducto del Sur (also known as Venezuela-Argentina Gas Line) was a proposed 8,000–15,000-kilometer (5,000–9,300 mi) long natural gas pipeline to connect Venezuela, Brazil and Argentina. The overall project cost was expected to be around US$17-23 billion.

History On 9 December 2005, during an annual meeting of Mercosur in Montevideo, the presidents of Venezuela, Argentina, and Brazil signed an accord for the construction of the pipeline. In June 2007 Petrobras president Jose Sergio Gabrielli said that the pipeline would not become operational for 20 to 30 years. In July 2007 Venezuelan President Hugo Chávez said that interest in building the pipeline had cooled.

Route The exact route of the pipeline was never defined. It was only disclosed that the first 2,950 kilometres (1,830 mi) section was to run from Puerto Ordaz, Venezuela, through Rondônia, Amazonas and Amapá states in Brazil to Marabá, Pará state Brazil. In Manaus, Amazonas State, the pipeline was to be connected to the Urucu–Manaus pipeline and the Urucu-Porto Velho pipeline. From Marabá, a 1,387 kilometres (862 mi) branch line to Fortaleza, Ceará State was foreseen. In Fortaleza the pipeline can be connected to the existing system that extends along the coast to Salvador, Bahia State to be connected with the GASENE pipeline. The second 1,977 kilometres (1,228 mi) long section from Marabá was to continue southward to São Paulo State. From there, the pipeline was to be routed by the 1,875 kilometres (1,165 mi) section to the border between Rio Grande do Sul State and Uruguay and then cross Uruguay to Argentina.

Technical features The Puerto Ordaz-Marabá section was planned to have a 66-inch (1,700 mm) diameter and to have 13 compressor stations of 25,000 hp each. The diameter of the Marabá-Fortaleza branch as planned would gradually decrease from 36 inches (910 mm) to 32 inches (810 mm) and the branch project involves the installation of five 15,000 hp compression stations. The gas amount received in Fortaleza was planned to be 12.75 billion cubic meter (bcm) of natural gas per annum. The Marabá-São Paulo section was to be 54 inches (1,370 mm) in diameter and to include eight 20,000 hp compression stations. The gas delivered to São Paulo was planned to be 15 bcm per annum. The Brazil-Argentina section with capacity of 18 bcm per annum was to include eight 15,000 hp compressor stations.

Financing The project was to be financed by Petróleos de Venezuela S.A., CAF – Development Bank of Latin America and the Caribbean, and Caixa Econômica Federal with possible participation of other public institutions and private investors.

References

Illustrations

Gran Gasoducto del Sur illustration

Worked examples

Example 1 — a first encounter with Gran Gasoducto del Sur

Start with the simplest possible case. Write down what Gran Gasoducto del Sur claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In physics, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Gran Gasoducto del Sur before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Gran Gasoducto del Sur ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Gran Gasoducto del Sur

In research
Gran Gasoducto del Sur appears in physics research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Gran Gasoducto del Sur in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Gran Gasoducto del Sur is common in secondary-school and first-year university syllabi. It links to neighbouring topics Argentina–Brazil relations, Argentina–Venezuela relations, Brazil–Venezuela relations, so understanding it makes those chapters shorter.
In everyday life
Look for Gran Gasoducto del Sur outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Gran Gasoducto del Sur” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Gran Gasoducto del Sur in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Gran Gasoducto del Sur means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Gran Gasoducto del Sur out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Gran Gasoducto del Sur in simple terms?

The Gran Gasoducto del Sur (also known as Venezuela-Argentina Gas Line) was a proposed 8,000–15,000-kilometer (5,000–9,300 mi) long natural gas pipeline to connect Venezuela, Brazil and Argentina. The overall project cost was expected to be around US$17-23 billion.

Why does Gran Gasoducto del Sur matter?

Because it connects several physics ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Gran Gasoducto del Sur?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Gran Gasoducto del Sur.

Tags

  • Argentina–Brazil relations
  • Argentina–Venezuela relations
  • Brazil–Venezuela relations
  • Cancelled energy infrastructure
  • Natural gas pipelines in Argentina
  • Natural gas pipelines in Brazil
  • Natural gas pipelines in Venezuela

Keep exploring