Growian or GROWIAN (short for German "Große Windenergieanlage" - "Large wind turbine") was a publicly funded wind turbine built in the Kaiser-Wilhelm-Koog near Marne for purposes of technology testing in the 1980s. It was a two-bladed "lee runner" (the rotor was situated on the downwind side of the tower) with a hub height of about 100 metres (330 ft) and, at 3 megawatts, it was the world's largest at the time, being operated since 1983. It was a design by committee, with some partners even expressing interest in the project to fail, which it duly did. Its failure delayed the progress of wind power in Germany and Energiewende (German for 'energy turnaround') by twenty-five years. For a long time Growian was the world's largest wind turbine. Many features of the installation were novel and had not previously been tested at this scale. Due to manufacturing faults in the casing, the turbine could not be run at full performance, and various issues with materials and construction prevented continuous testing. Consequently, the installation was idle for the greater part of the period between the first test run on 6 July 1983 (official start of operations was 4 October 1983) and end of operations in August 1987. Growian was decommissioned over the course of 1987, and dismantled in summer 1988.
Technical specification
Growian's power rating was 3,000 kW, at the time the highest in the world. The rotor had an oscillating nave, a diameter of 100.4 metres (329 ft), and revolved at approximately 19.5 rpm. The orientation of the two blades was regulated by a mechanical-electrical mechanism. In contrast to most modern turbines, the blades rotated on the leeward side of the tower. The turbine house at a height of 100 metres (330 ft) weighed 340 t, and each blade weighed 23 t. The turbine had a switching on speed of 5.4 m/s (12 mph) and a rated speed of 12 m/s (27 mph). It would cut out at a speed of 24 m/s (54 mph) and was rated for a maximum survivable speed of 60 m/s (134 mph). Projected annual energy yield at a mean wind speed of 9.3 m/s (21 mph) was approximately 12 GWh. Rotor and induction generator were mechanically coupled by a gearing mechanism consisting of one spur gear and two epicyclic gears. Feed-in to the power grid was realized using a set of motor–generators that was largely identical to that later used at Umspannwerk Neuhof, one of the few electrical substations that allowed for electricity import from the GDR. The rotors were constructed using steel walers, and in cross section consisted of a steel core, an outer skin, and fibreglass reinforcement rods. The tower and one of the rotors are on display at the Technik Museum Sinsheim. The total cost of the installation was about 87 million Deutsche Mark.
Development and outcomes
… excerpt ends here. Continue reading the full article.