The Hetton colliery railway was an 8-mile (13 km) long private railway opened in 1822 by the Hetton Coal Company at Hetton-le-Hole, County Durham, England. The Hetton was the first railway to be designed from the start to be operated without animal power, as well as being the first entirely new line to be developed by the pioneering railway engineer George Stephenson. As originally built, the Hetton colliery railway ran between Hetton Colliery, which was roughly two miles (3.2 km) south of Houghton-le-Spring, and a staithe (wharf) on the River Wear, from where the coal was conveyed further by boat. By its closure in 1959, it was recognised as being the oldest mineral railway in Great Britain.
History
Background At the beginning of the 19th century, Hetton was a very small village, located about 3.2 km south of Houghton-le-Spring. By this time, it was already recognised as being on the edge of an exposed area of coal which covered parts of Northumberland and County Durham; this motivated local landowner Thomas Lyon, as well as his son John Lyon, to prospect for deeper-running seams of coal on their own estate. While multiple attempts had identified the presence of coal, flooding and other difficulties complicated efforts to exploit it, while geologists of the period were often sceptical that meaningful amounts of coal existed at all, or speculated that they would be of such low quality and quantity that it would not be worth the effort. Based on the results of a favourable survey report in April 1816, the Hetton Coal Company was established as a partnership three years later, becoming County Durham’s first major company; on 13 May 1821, the company signed a mining lease with Lyon. The company’s management, which consisted largely of experienced colliers and local investors, quickly recognised that any large-scale extraction effort would necessitate a means of transporting this coal towards customers, which could be found in the vicinity of the city of Sunderland. Following a review of various options, it was decided that the use of a railway, which would run on an alignment between the colliery and the nearby River Wear, would be the most appropriate measure.
Construction The pioneering railway engineer, George Stephenson, was recruited by the company to design the Hetton colliery railway, while his son, Robert Stephenson, was appointed as the resident engineer to oversee its construction. The line was the first to be designed for being operated without the use of animal power for movement; instead, a combination of self-acting inclines, stationary engine-hauled inclines and locomotive working was used. Adopting a longer but flatter route for the line was deemed to have been less cost efficient than a shorter, more aggressively inclined one, as this dispensed with numerous cuttings and embankments. Work on the railway commenced prior to the extraction of the first coal from the mine, the first shafts of which being sunk during December 1820. In March 1821, progress on the line had been such that track-laying activity commenced that month. This track used an arrangement of half-lap joints and chairs in a technique that Stephenson, together with the industrialist William Losh, had co-patented five years beforehand; the rails, composed of cast iron, were produced at the Walker Ironworks. The Hetton colliery railway was built to Stephenson's standard gauge of 4 ft 8 in (1,422 mm), which had already been previously used for the Killingworth wagonway, which Stephenson had been involved in, as well as other sites, such as the Wallsend Waggonway. One of the more challenging geographical features of the route was Warden Law Hill; this was addressed in the form of a pair of stationary reciprocating engines, each capable of generating up to 44.7 kW of power, which hauled groups of eight wagons. Overall, the route featured a total of five self-acting inclines, where a roped system would allow the ascending empty wagons to be powered up the incline by the momentum of the descending laden wagons. The line also featured a single tunnel, which possessed a length of 1533 yards.
Operations
Early activities
On 18 November 1822, the Hetton colliery railway was officially opened. The first coal extracted by the colliery was transported on a train comprising 17 wagons to four drops at the Sunderland staith. Upon arrival, coal would be tipped onto the timber staith from the assorted wagons, after which it would be stored in a timber building while awaiting shipment. Upon the arrival of a vessel, it would be gravity-loaded directly into the hold via a lengthy chute. However, the company was not fully satisfied with the railway’s early operations. Being much in demand, concerns were raised that the line was not achieving its design capacity. This climate of scepticism heavily contributed to the dismissal of Robert Stephenson in 1823 and his replacement as resident engineer by Joseph Smith; around the same time, William Chapman was appointed to advise on improvements, while George Dodds was given the position of railway superintendent during the following year. During 1823, various works upon the railway were carried out, presumably these are attributabled to Chapman; changes included the installation of a third stationary engine, which was operational by 1826, for working the Warden Law incline, while an extra gravity incline was established at the staith to shorten the chute distance. Demand for the railway continued to grow; by 1825-6, it was also carrying coal from collieries at Elemore, Eppleton and North Hetton, which were serviced via gravity incline branches that connected onto the main line. By the 1850s, the development of considerably more-powerful steam engines enabled locomotive working to be reinstated along the 'long run' of the colliery line. It was around this time, the complex of sidings and engineering workshops at Hetton were substantially enlarged, while a 1.2 km branch line, running southwards to a coal depot in Easington Lane, was constructed.
… excerpt ends here. Continue reading the full article.