ArticleslgStudy

engineering

Ike Dike

Ike Dike is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Ike Dike rather than just read about it. In short: The Ike Dike is a proposed coastal barrier that, when completed, would protect the Galveston Bay in Texas, United States. The project would be a dramatic enhancement of the existing Galveston Seawall, complete with floodgates, which would protect more of Galveston, the Bolivar Peninsula, the Galveston Bay Area, and Houston.

Ike Dike — main illustration
Ike Dike — illustration

Key takeaways

  • Ike Dike belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Ike Dike to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Ike Dike from memory before moving on to harder problems.

Reference excerpt

The Ike Dike is a proposed coastal barrier that, when completed, would protect the Galveston Bay in Texas, United States. The project would be a dramatic enhancement of the existing Galveston Seawall, complete with floodgates, which would protect more of Galveston, the Bolivar Peninsula, the Galveston Bay Area, and Houston. The barrier would extend across Galveston Island and the Bolivar Peninsula and would provide a barrier against all Gulf surges into the bay. The project is primarily the suggestion of Dr. Bill Merrell of Texas A&M University at Galveston. The Ike Dike would be able to withstand a 10,000-year storm. The proposal is, as the name suggests, motivated by the damage caused by Hurricane Ike in 2008 (as well as the disastrous 1900 Galveston Hurricane). Storm surges from Hurricane Ike caused severe damage to Galveston and the Bolivar Peninsula and caused significant damage to other areas around the bay. The damage to critical industries was minimal and most heavy industries returned to normal quickly. Still, Ike was not nearly as destructive as meteorologists predict a future hurricane will eventually be. Proponents argue that there is a national security concern that must be addressed. The Houston area (particularly the Bay Area) is home to the largest and most important concentration of petroleum refining and petrochemical processing plants in the United States, and most of these plants are on the coast or on the ship channel. Additionally, the Port of Houston is the second-busiest port in the nation. The economic damage to the United States, not to mention Texas, in the event of a catastrophic impact on the coast would be nationally serious. Indeed, some researchers have argued that had Ike tracked a few miles further southwest it could have sidelined 40% of U.S. jet-fuel production, not to mention serious setbacks to the production of gasoline and other chemicals Opponents of the project worry that it is simply too expensive--with escalating costs. Originally conceived as $2-$4 billion project, a fall 2021 estimated cost was $29 billion, and it was projected to cost a total of $34 billion; the 2023 Defense Authorization bill included $31 billon for the project. In 2017 the Sierra Club and other environmentalists warned about the risk to marine life in the area. Several groups were proving their own recommendations on the technical aspects and design of the storm-surge protection system.

In 2010 the Texas Governor publicly expressed support for the idea. The Governor's Commission on Disaster Recovery and Renewal recommended that a 6-county (Harris, Galveston, Chambers, Brazoria, Orange and Jefferson) public corporation be established to examine regional approaches to storm surge suppression. That corporation, the Gulf Coast Community Protection and Recovery District, Inc., was established on April 20, 2010. Galveston County Judge Jim Yarborough was elected chair of the board of directors and Robert Eckels, former county judge of Harris County, was elected president. Dannenbaum Engineering was appointed as the engineering consultant. Despite this, though, the declining economy in 2010 stifled efforts to secure funding and the project remains stalled. By the end of 2012 momentum toward building the structure had waned significantly, in large part due to Hurricane Sandy, which seriously damaged the U.S. Northeast and attracted attention away from the Gulf Coast. Nevertheless, in 2013 Bay Area Houston Economic Partnership, a local community organization, began efforts to raise funds for a comprehensive study that could convince the U.S. Congress to fund the project. In addition, throughout 2013 researchers at Delft University of Technology worked out several flood defense concepts for closing off the Bolivar Roads Inlet. On Monday August 4, 2014, Texas legislators lamented a disagreement on how to protect the Houston region against storm surge and urged that a plan be brought to the Legislature as soon as possible. The project manager named by Dannenbaum Engineering to study the Ike Dike and alternatives, Christopher W. Sallese, is a retired U.S. Army Corps of Engineer colonel. He was the district engineer and commanding officer of the Galveston District. Sallese is named as one of several defendants in an April 19, 2013, federal lawsuit filed in United States District Court, Southern District of Texas, Galveston Division, as Civil Action No. 3:13-CV-00126. This lawsuit is significant because the East Galveston Bay complex and neighboring counties would be changed greatly if the dike was constructed. Property owners and the economic base of the area would face tremendous changes. In addition, the Rollover Pass area is a federally protected critical habitat for endangered species and is a key point for marine species migration. In 2018, the Army Corps of Engineers gave its approval to a dike plan estimated to cost between $23 and $31 billion. The proposal is similar to, but not identical to, Merrell's original proposal. Additional studies for the proposal are expected to be completed in 2021 at which time Congress would be expected to debate funding. In May 2021, the Texas legislature approved the barrier proposal. As of August 2021, the plan had been submitted to the U.S. Congress for consideration to be funded as part of the infrastructure plans proposed by President Biden. In the summer of 2022, the U.S. Congress approved the Water Resources and Development Act which would authorize the U.S. Army Corps of Engineers to begin planning the Ike Dike, though funding has not been secured. In January 2023, the Defense budget authorized $31 billion (of a $34 billion project total project cost) for the Ike Dike. In June 2023, the Texas legislature authorized $550 million for the Ike Dike.

Notes

… excerpt ends here. Continue reading the full article.

Illustrations

Ike Dike illustration
Ike Dike: Map of Galveston Bay; Galveston Island is at center with Bolivar Peninsula to its northeast.
Map of Galveston Bay; Galveston Island is at center with Bolivar Peninsula to its northeast.

Worked examples

Example 1 — a first encounter with Ike Dike

Start with the simplest possible case. Write down what Ike Dike claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Ike Dike before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Ike Dike ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Ike Dike

In research
Ike Dike appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Ike Dike in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Ike Dike is common in secondary-school and first-year university syllabi. It links to neighbouring topics Galveston County, Texas, Proposed buildings and structures in Texas, Proposed infrastructure in the United States, so understanding it makes those chapters shorter.
In everyday life
Look for Ike Dike outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Ike Dike” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Ike Dike in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Ike Dike means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Ike Dike out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Ike Dike in simple terms?

The Ike Dike is a proposed coastal barrier that, when completed, would protect the Galveston Bay in Texas, United States. The project would be a dramatic enhancement of the existing Galveston Seawall, complete with floodgates, which would protect more of Galveston, the Bolivar Peninsula, the Galves…

Why does Ike Dike matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Ike Dike?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Ike Dike.

Tags

  • Galveston County, Texas
  • Proposed buildings and structures in Texas
  • Proposed infrastructure in the United States
  • Seawalls

Keep exploring