ArticleslgStudy

engineering

Inter-Action Centre

Inter-Action Centre is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Inter-Action Centre rather than just read about it. In short: The Inter-Action Centre was one of architect Cedric Price's few realized projects. The community centre, sited at Talacre Public Open Space in Kentish Town, in the London Borough of Camden, was commissioned in 1964 by Ed Berman and the Inter-Action Trust and built in 1971.

Key takeaways

  • Inter-Action Centre belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Inter-Action Centre to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Inter-Action Centre from memory before moving on to harder problems.

Reference excerpt

The Inter-Action Centre was one of architect Cedric Price's few realized projects. The community centre, sited at Talacre Public Open Space in Kentish Town, in the London Borough of Camden, was commissioned in 1964 by Ed Berman and the Inter-Action Trust and built in 1971. The Inter-Action Centre is particularly notable for having been one of the first buildings to make concrete the ideas of flexible architecture and impermanence. Price's body of work as a whole had a tremendous influence on the architecture profession, and the Inter-Action Centre helped realize the ambitions of his earlier, unbuilt Fun Palace (which had proposed the fusion of architecture and information technology, entertainment and educational activities) and Potteries Thinkbelt. It was constructed around an open framework into which modular, pre-fabricated elements could be inserted and removed according to need. It was essentially a building that could be reconfigured over time as its occupants' requirements evolved. Often compared to Centre Pompidou and other high-tech buildings of the time, the Inter-Action Centre differed in being explicitly designed around a democratic approach to architecture. Price had been working with, and was influenced by, cybernetician Gordon Pask and used the Inter-Action Centre as a way to present an architectural approach to second-order cybernetics. The Inter-Action Centre was architectural evidence that Price's radical and utopian agenda could be materialized in a built form with a clear social agenda, though there is also a view that the building showed that his goals were not quite realizable in the real world. Price himself persuaded English Heritage not to list the building, and supported its demolition in 2003 because he believed it had fulfilled its purpose as a temporary commodity with a short lifespan.

References

Further reading InterAction Centre – Hidden Architecture InterAction Centre, Kentish Town, London – Moma Cedric Price: Think the Unthinkable – Architects Journal

Worked examples

Example 1 — a first encounter with Inter-Action Centre

Start with the simplest possible case. Write down what Inter-Action Centre claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Inter-Action Centre before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Inter-Action Centre ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Inter-Action Centre

In research
Inter-Action Centre appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Inter-Action Centre in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Inter-Action Centre is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures completed in 1971, Buildings and structures demolished in 2003, Community centres in London, so understanding it makes those chapters shorter.
In everyday life
Look for Inter-Action Centre outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Inter-Action Centre” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Inter-Action Centre in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Inter-Action Centre means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Inter-Action Centre out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Inter-Action Centre in simple terms?

The Inter-Action Centre was one of architect Cedric Price's few realized projects. The community centre, sited at Talacre Public Open Space in Kentish Town, in the London Borough of Camden, was commissioned in 1964 by Ed Berman and the Inter-Action Trust and built in 1971.

Why does Inter-Action Centre matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Inter-Action Centre?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Inter-Action Centre.

Tags

  • Buildings and structures completed in 1971
  • Buildings and structures demolished in 2003
  • Community centres in London
  • Demolished buildings and structures in London
  • Former buildings and structures in the London Borough of Camden
  • Kentish Town

Keep exploring