ArticleslgStudy

science

Latham Report

Latham Report is a science topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Latham Report rather than just read about it. In short: The Latham Report, titled Constructing the Team, was an influential report written by Sir Michael Latham, published in July 1994. Latham was commissioned by the United Kingdom government and industry organisations to review procurement and contractual arrangements in the UK construction industry, aiming to tackle controversial issues facing the industry during a period of lapse in growth as a whole.

Key takeaways

  • Latham Report belongs to science; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Latham Report to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Latham Report from memory before moving on to harder problems.

Reference excerpt

The Latham Report, titled Constructing the Team, was an influential report written by Sir Michael Latham, published in July 1994. Latham was commissioned by the United Kingdom government and industry organisations to review procurement and contractual arrangements in the UK construction industry, aiming to tackle controversial issues facing the industry during a period of lapse in growth as a whole.

Historical context The Latham Report was not the first report to identify systemic failings in the UK construction industry; previous reports dating back to the 1960s had identified similar issues and made similar recommendations. However, this report did gain industry and government support.

The report Latham identified industry inefficiencies, condemning existing industry practices as 'adversarial', 'ineffective', 'fragmented', 'incapable of delivering for its clients' and 'lacking respect for its employees'. He urged reform and advocated partnering and collaboration by construction companies. A key concept was that through teamwork the construction industry could delight its customers. Latham made 53 recommendations to change industry practices, to increase efficiency and to replace the bureaucratic, wasteful, adversarial atmosphere prevalent in most construction projects with one characterised by openness, co-operation, trust, honesty, commitment and mutual understanding among team members. For example:

"Partnering includes the concepts of teamwork between supplier and client, and of total continuous improvement. It requires openness between the parties, ready acceptance of new ideas, trust and perceived mutual benefit…. We are confident that partnering can bring significant benefits by improving quality and timeliness of completion whilst reducing costs." (para 6.45, p. 62) "Partnering arrangements are also beneficial between firms…. Such arrangements should have the principal objective of improving performance and reducing costs for clients. They should not become 'cosy'. The construction process exists to satisfy the client. Good relationships based on mutual trust benefit clients." (para 6.46, p. 62)

Recommendations The government should commit itself to being a best practice client. The private sector should get together to establish a construction clients forum. The Construction Industry Council (CIC) should issue a guide to briefing for clients. The DoE should publish a simply worded construction strategy code of practice. A checklist of design responsibilities should be prepared. The use of co-ordinated project information should be a contractual requirement. The responsibilities for building services design should be clearly defined. A set of basic principles is required on which modern contract should be based. A complete family of interlocking contractual documents is required. A target should be set for 33% of government funded projects starting over the next four years to use the New Engineering Contract. The role and duties of project managers requires to be more clearly defined. The DoE should develop quality registers of approved contractors, sub-contractors and consultants. Guidance should be issued on rationalising tender list arrangements and on partnering. The specific efforts of BS5750 in the construction process requires further investigation. Adjudication should be the normal form of dispute resolution.

Legacy The Report spawned a raft of initiatives including the establishment of the Construction Industry Board to oversee reform. At the request of the Construction Clients' Forum (formed following Latham's recommendation), the CIB published a further report, Partnering in the Team in 1996. In parallel, the industry reform group, the Reading Construction Forum, published Trusting the Team: the Best Practice Guide to Partnering in Construction in 1995 (for which Latham wrote the foreword). Subsequent initiatives included the 1998 Egan Report Re-thinking construction, and the establishment of industry change organisations including the Design Build Foundation (1997) Construction Best Practice Programme, the IT Construction Best Practice Programme, Movement for Innovation and Constructing Excellence. The Latham and Egan Reports' focus on collaboration was also referenced by Chief Construction Adviser Paul Morrell in the UK government construction strategy in 2011. Latham's call for quality registers of approved contractors, sub-contractors and consultants led to the 1998 establishment of Constructionline. The Latham Review commended the establishment of the Interdisciplinary Design for the Built Environment programme at the University of Cambridge (page 73) and in turn was one of the influences that helped to shape the early syllabus of the IDBE course.

Notes and references

Worked examples

Example 1 — a first encounter with Latham Report

Start with the simplest possible case. Write down what Latham Report claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In science, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Latham Report before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Latham Report ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Latham Report

In research
Latham Report appears in science research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Latham Report in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Latham Report is common in secondary-school and first-year university syllabi. It links to neighbouring topics 1994 in British politics, 1994 in the United Kingdom, Building, so understanding it makes those chapters shorter.
In everyday life
Look for Latham Report outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Latham Report” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Latham Report in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Latham Report means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Latham Report out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Latham Report in simple terms?

The Latham Report, titled Constructing the Team, was an influential report written by Sir Michael Latham, published in July 1994. Latham was commissioned by the United Kingdom government and industry organisations to review procurement and contractual arrangements in the UK construction industry, a…

Why does Latham Report matter?

Because it connects several science ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Latham Report?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Latham Report.

Tags

  • 1994 in British politics
  • 1994 in the United Kingdom
  • Building
  • Construction industry in the United Kingdom
  • July 1994 in the United Kingdom
  • Reports of the United Kingdom government

Keep exploring