The levelized cost of electricity (LCOE) is a measure of the average net present cost of electricity generation for a generator over its lifetime. It is one of several cost metrics used for investment planning and to compare different methods of electricity generation on a consistent basis. The more general term levelized cost of energy may include the costs of either electricity or heat. The latter is also referred to as levelized cost of heat or levelized cost of heating (LCOH), or levelized cost of thermal energy.
Definition The cost of electricity production depends on costs during the expected lifetime of the generator and the amount of electricity the generator is expected to produce over its lifetime. The levelized cost of electricity (LCOE) is the constant price per unit of energy that would yield a net present value of zero for the project, or, more technically, the "cost that, if assigned to every unit of energy produced (or saved) by the system over the analysis period, will equal the [total life-cycle cost] (TLCC) when discounted back to the base year." LCOE is defined by the formula:
L C O E = discounted sum of costs over lifetime discounted sum of electrical energy produced over lifetime = ∑ t = 1 n I t + M t + F t ( 1 + r ) t ∑ t = α n E t ( 1 + r ) t {\displaystyle \mathrm {LCOE} ={\frac {\text{discounted sum of costs over lifetime}}{\text{discounted sum of electrical energy produced over lifetime}}}={\frac {\sum _{t=1}^{n}{\frac {I_{t}+M_{t}+F_{t}}{\left({1+r}\right)^{t}}}}{\sum _{t=\alpha }^{n}{\frac {E_{t}}{\left({1+r}\right)^{t}}}}}}
Input values are:
Applicability LCOE is an estimation of the cost of production of electricity and not the price of electricity. The price of electricity may be influenced by additional factors including markup and price controls. LCOE is commonly used for:
Feasibility study decisions for new electricity generation projects. Investment strategy decisions made by businesses and governments. Energy policy decisions made by governments. Significant caution needs to be applied to use of LCOE as outputs are highly sensitive to the selection of input values. The ability to interpret and compare LCOE model outputs is dependent upon the level of detailed justification provided for input values and the results of sensitivity analysis against the selection of input values. For any given electricity generation technology, LCOE can vary significantly from region to region depending on factors such as the cost of fuel or availability of renewable energy resources. For LCOE to be usable for rank-ordering energy-generation alternatives, caution must be taken to calculate it in "real" terms, i.e. including adjustment for expected inflation. An energy efficiency gap phenomenon exists due to observed lack of consideration of and implementation of demand-side energy conservation. LCOE is typically used in support of supply-side generation capacity replacement and expansion decision making. The energy efficiency gap phenomenon suggests demand-side energy conservation should also be considered in investment strategies and energy policy.
Limitations LCOE is often cited as a convenient summary measure of the overall competitiveness of different generating technologies, however, it has potential limitations. Decisions about investments in energy generation technologies may need to be guided by other measures such as the levelized cost of storage (LCOS) and the levelized avoided cost of energy (LACE), in addition to the LCOE. One of the most important potential limitations of LCOE is that it may not control for time effects associated with matching electricity production to demand. This can happen at two levels:
… excerpt ends here. Continue reading the full article.

![Levelized cost of electricity: With increasingly widespread implementation of renewable energy sources, costs have declined, most notably for energy generated by solar panels.[1][2]Levelized cost of energy (LCOE) is a measure of the average net present cost of electricity generation for a generating plant over its lifetime.](https://upload.wikimedia.org/wikipedia/commons/thumb/a/af/20201019_Levelized_Cost_of_Energy_%28LCOE%2C_Lazard%29_-_renewable_energy.svg/500px-20201019_Levelized_Cost_of_Energy_%28LCOE%2C_Lazard%29_-_renewable_energy.svg.png?utm_source=en.wikipedia.org&utm_campaign=parser&utm_content=thumbnail)