ArticleslgStudy

science

Middle Rio Grande Project

Middle Rio Grande Project is a science topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Middle Rio Grande Project rather than just read about it. In short: The Middle Rio Grande Project manages water in the Albuquerque Basin of New Mexico, United States. It includes major upgrades and extensions to the irrigation facilities built by the Middle Rio Grande Conservancy District and modifications to the channel of the Rio Grande to control sedimentation and flooding.

Middle Rio Grande Project — main illustration
Middle Rio Grande Project — illustration

Key takeaways

  • Middle Rio Grande Project belongs to science; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Middle Rio Grande Project to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Middle Rio Grande Project from memory before moving on to harder problems.

Reference excerpt

The Middle Rio Grande Project manages water in the Albuquerque Basin of New Mexico, United States. It includes major upgrades and extensions to the irrigation facilities built by the Middle Rio Grande Conservancy District and modifications to the channel of the Rio Grande to control sedimentation and flooding. The bulk of the work was done by the United States Bureau of Reclamation and the United States Army Corps of Engineers in the 1950s, but construction continued into the 1970s and maintenance is ongoing. The project is complementary to the San Juan–Chama Project, which transfers water from the San Juan River in the Colorado River Basin to the Rio Grande. Although distribution of water from the two projects is handled through separate allotments and contracts, there is some sharing of facilities including the river itself. The ecological impact on the river and the riparian zone was the subject of extended litigation after a group of environmentalists filed Rio Grande Silvery Minnow v. Bureau of Reclamation in 1999.

Background The Rio Grande valley from Taos Pueblo downstream to Socorro has been continuously settled for longer than any other part of the United States. The Pueblo Indians diverted water from the river for irrigation. Spanish settlers who arrived in the 17th century established a more extensive system of acequias, or shared irrigation canals. More settlers arrived after the region was ceded to the United States in 1848, particularly after the American Civil War (1861-1865). Irrigation peaked in 1880 with 1,248,000 acres (505,000 ha) of cultivated land in the stretch of valley from Cochiti to San Marcial. The extent of cultivation began to decline after this due to water shortage, floods and waterlogging caused by aggradation of the riverbed, a rising water table and poor drainage. The Middle Rio Grande Conservancy District was established in 1925 to address these problems. It ran into financial difficulties and asked the Bureau of Reclamation to help investigate the problems and rehabilitation the irrigation facilities. The Flood Control Act of 30 June 1948 approved the comprehensive plan for the project, and also directed the Bureau of Reclamation to look into methods of reducing non-beneficial use of water by phreatic vegetation in the Rio Grande flood plains and its main tributaries above Caballo Reservoir. The Bureau of Reclamation and the Corps of Engineers worked together to plan the project. The Flood Control Act of 17 May 1950 approved completion of the plan. The Bureau of Reclamation was responsible for rehabilitating the El Vado dam, the irrigation and drainage works and the river channel. The Corps of Engineers was responsible for building flood control reservoirs and flood protection levees.

Overview

The Middle Rio Grande Project includes the river, dams, irrigation and drainage channels from Velarde south to the point where the river enters the Elephant Butte Reservoir. It also includes maintenance of the river near Truth or Consequences, New Mexico. The irrigation facilities, originally built by the conservancy district, irrigate up to 89,652 acres (36,281 ha), and include 30,000 acres (12,000 ha) of Indian water rights lands. The Bureau of Reclamation operates and maintains El Vado Dam and the river from Velarde to the Narrows of Elephant Butte Reservoir. The Middle Rio Grande Conservancy District operates the irrigation facilities, including the three diversion dams. The Corps of Engineers operates and maintains Cochiti Dam.

Construction

Storage In 1934-1935 the conservancy district built the El Vado Dam on the Rio Chama about 160 miles (260 km) north of Albuquerque to store irrigation water for use in dry periods. In 1954-1955 the Bureau of Reclamation rehabilitated the dam, a rolled-gravel embankment with a steel membrane on the upstream face, 230 feet (70 m) high with a crest length of 1,326 feet (404 m). In 1965-1968 the Bureau of Reclamation built a new outlet works to handle additional water delivered by the San Juan–Chama Project. The reservoir has a capacity of 196,500 acre-feet (one acre foot equaling 43,560 cubic feet (1,233 m3)). The dam feeds an 8,000 kilowatt hydroelectric power plant operated by Los Alamos County. In 1974-1975 the Cochiti Dam was constructed by the Corps of Engineers for flood control, inundating the former Cochiti Diversion Dam. It also provides irrigation water to the Cochiti Division.

Diversions The Bureau of Reclamation rehabilitated four diversion dams. Angostura Diversion Dam, rehabilitated in 1958, serves the Albuquerque Division. It is a concrete weir section 17 feet (5.2 m) high and 800 feet (240 m) long. Isleta Diversion Dam, rehabilitated in 1955, serves the Belen Division. It is a reinforced concrete structure 21 feet (6.4 m) high and 674 feet (205 m) long with 30 radial gates. San Acacia Diversion Dam, rehabilitated in 1957, serves the Socorro Division. It is 17 feet (5.2 m) high and 700 feet (210 m) long, with 29 radial gates. The Cochiti Division was formerly served by the Cochiti Diversion Dam, rehabilitated in 1958, but is now supplied directly from Cochiti Dam.

Irrigation and drainage The distribution and drainage system includes 202 miles (325 km) of canals, of which about 6 miles (9.7 km) are concrete lined; 580 miles (930 km) of laterals, of which about 4 miles (6.4 km) are concrete lined; and 405 miles (652 km) of open and concrete pipe drains, most of which are open section. From 1953 to 1961 the Bureau of Reclamation undertook extensive rehabilitation of canals, laterals, drains, and acequias throughout the project. In 1951 the Bureau of Reclamation began construction of the low-flow conveyance channel between San Acacia Diversion Dam and the Narrows of Elephant Butte, completing the job in 1959. In 1961 the Bureau of Reclamation completed modification of the headworks for the Socorro Main Canal north at San Acacia Diversion Dam. In 1975 the canal was tied into Drain Unit No. 7 Extension and then to Drain Unit No. 7 system.

… excerpt ends here. Continue reading the full article.

Illustrations

Middle Rio Grande Project illustration
Middle Rio Grande Project: Rio Grande basin, showing dams and diversions. Middle Rio Grande Project is in the northwest.
Rio Grande basin, showing dams and diversions. Middle Rio Grande Project is in the northwest.
Middle Rio Grande Project: Cochiti reservoir
Cochiti reservoir

Worked examples

Example 1 — a first encounter with Middle Rio Grande Project

Start with the simplest possible case. Write down what Middle Rio Grande Project claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In science, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Middle Rio Grande Project before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Middle Rio Grande Project ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Middle Rio Grande Project

In research
Middle Rio Grande Project appears in science research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Middle Rio Grande Project in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Middle Rio Grande Project is common in secondary-school and first-year university syllabi. It links to neighbouring topics Environment of New Mexico, Irrigation in the United States, Irrigation projects, so understanding it makes those chapters shorter.
In everyday life
Look for Middle Rio Grande Project outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Middle Rio Grande Project in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Middle Rio Grande Project means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Middle Rio Grande Project out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Middle Rio Grande Project in simple terms?

The Middle Rio Grande Project manages water in the Albuquerque Basin of New Mexico, United States. It includes major upgrades and extensions to the irrigation facilities built by the Middle Rio Grande Conservancy District and modifications to the channel of the Rio Grande to control sedimentation a…

Why does Middle Rio Grande Project matter?

Because it connects several science ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Middle Rio Grande Project?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Middle Rio Grande Project.

Tags

  • Environment of New Mexico
  • Irrigation in the United States
  • Irrigation projects

Keep exploring