ArticleslgStudy

engineering

Movement House

Movement House is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Movement House rather than just read about it. In short: Movement House is a building under construction in Kampala, the capital of Uganda and the largest city in that country. The building is sometimes referred to as NRM House, in reference to its largest tenant, the National Resistance Movement (NRM), the ruling political party in Uganda since 1986.

Movement House — main illustration
Movement House — illustration

Key takeaways

  • Movement House belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Movement House to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Movement House from memory before moving on to harder problems.

Reference excerpt

Movement House is a building under construction in Kampala, the capital of Uganda and the largest city in that country. The building is sometimes referred to as NRM House, in reference to its largest tenant, the National Resistance Movement (NRM), the ruling political party in Uganda since 1986.

Location The skyscraper is located on Hannington Road, on Nakasero Hill, one of the most prestigious locations in Kampala's central business district. This location is adjacent to Crested Towers South, the headquarters of Stanbic Bank (Uganda) Limited, and Crested Tower North, the headquarters of the European Union mission in Uganda. The two towers lie to the west of Movement House. To the south, across Nile Avenue, is the under-construction Kampala Intercontinental Hotel. The coordinates of Movement House are: Latitude:0.318334; Longitude:32.589445 (+0° 19'06.00"N, +32° 35'22.00"E). The street address of the building is 36 Hannington Road, Nakasero, Kampala.

Overview When completed as expected, in 2016, the building will house the headquarters of the NRM, the ruling political party in Uganda. It will also house rentable office and retail space, restaurants, banking halls, conference facilities, a shopping complex, movie theatres, and a roof garden. The building will sit on land that measures about 1.7 acres (0.69 ha), which once belonged to the first East African Community (1967 - 1977). It will be one of the tallest buildings in the city, at 27 stories above ground.

History The NRM is attempting to generate income for itself by investing in commercial real estate. The 27-storey building is being constructed in memory of the 27 young people who started the NRM in February 1981. Construction began in 2013, to commemorate 27 years since NRM first shot its way to power in 1986.

Construction costs The estimated total cost of construction is approximately US$12.5 million (UGX:30 billion). The funds will be raised from about 100,000 willing party members with an average donation of 300,000 Uganda Shillings (US$125) each. Construction is expected to begin in early 2013 with commissioning of the building in 2016. As of December 2014, approximately UGX:7 billion (US$2.6 million) had been raised from party members. Another UGX:16 billion (approx.: US $5 million), was raised during June 2015, at two separate dinners hosted by President Museveni at State House, Entebbe.

See also List of political parties in Uganda Politics of Uganda List of tallest buildings in Kampala

References

External links Artist's Impression of Movement House

Worked examples

Example 1 — a first encounter with Movement House

Start with the simplest possible case. Write down what Movement House claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Movement House before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Movement House ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Movement House

In research
Movement House appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Movement House in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Movement House is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures completed in 2016, Buildings and structures in Kampala, Headquarters of political parties, so understanding it makes those chapters shorter.
In everyday life
Look for Movement House outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Movement House in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Movement House means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Movement House out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Movement House in simple terms?

Movement House is a building under construction in Kampala, the capital of Uganda and the largest city in that country. The building is sometimes referred to as NRM House, in reference to its largest tenant, the National Resistance Movement (NRM), the ruling political party in Uganda since 1986.

Why does Movement House matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Movement House?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Movement House.

Tags

  • Buildings and structures completed in 2016
  • Buildings and structures in Kampala
  • Headquarters of political parties
  • National Resistance Movement
  • Skyscraper office buildings in Uganda

Keep exploring