ArticleslgStudy

science

New Austrian tunneling method

New Austrian tunneling method is a science topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand New Austrian tunneling method rather than just read about it. In short: The new Austrian tunneling method (NATM), also known as the sequential excavation method (SEM) or sprayed concrete lining method (SCL), Neue Österreichische Tunnelbaumethode (NÖT) in German, is a method of modern tunnel design and construction employing sophisticated monitoring to optimize various wall reinforcement techniques based on the type of rock encountered as tunneling progresses. This technique first gained…

Key takeaways

  • New Austrian tunneling method belongs to science; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect New Austrian tunneling method to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of New Austrian tunneling method from memory before moving on to harder problems.

Reference excerpt

The new Austrian tunneling method (NATM), also known as the sequential excavation method (SEM) or sprayed concrete lining method (SCL), Neue Österreichische Tunnelbaumethode (NÖT) in German, is a method of modern tunnel design and construction employing sophisticated monitoring to optimize various wall reinforcement techniques based on the type of rock encountered as tunneling progresses. This technique first gained attention in the 1960s based on the work of Ladislaus von Rabcewicz, Leopold Müller, and Franz Pacher between 1957 and 1965 in Austria. The name NATM was intended to distinguish it from earlier methods, with its economic advantage of employing inherent geological strength available in the surrounding rock mass to stabilize the tunnel wherever possible rather than reinforcing the entire tunnel. NATM/SEM is generally thought to have helped revolutionise the modern tunneling industry. Many modern tunnels have used this excavation technique as it is very cost effective, even in karst conditions.

Principles The NATM integrates the principles of the behaviour of rock masses under load and monitoring the performance of underground construction during construction. The NATM has often been referred to as a "design as you go" approach, by providing an optimized support based on observed ground conditions. More correctly it can be described as a "design as you monitor" approach, based on observed convergence and divergence in the lining and mapping of prevailing rock conditions. It is not a set of specific excavation and support techniques. NATM has seven elements:

Exploitation of the strength of native rock mass – Relies on the inherent strength of the surrounding rock mass being conserved as the main component of tunnel support. Primary support is directed to enable the rock to support itself. Shotcrete protection – Loosening and excessive rock deformation must be minimised. This is achieved by applying a thin layer of shotcrete immediately after face advance. Measurement and monitoring – Potential deformations of the excavation must be carefully monitored. NATM requires installation of sophisticated measurement instrumentation. It is embedded in lining, ground, and boreholes. In the event of observed movements, additional supports are installed only when needed, with a resultant overall economy to the total cost of the project. Flexible support – The primary lining is thin and reflects recent strata conditions. Active rather than passive support is used and the tunnel is strengthened by a flexible combination of rock bolts, wire mesh and steel ribs, not by a thicker concrete lining. Closing of the invert – Especially crucial in soft ground, the quick closing of the invert (the bottom portion of the tunnel) which creates a load-bearing ring is important, and has the advantage of engaging the inherent strength of the rock mass surrounding the tunnel. Contractual arrangements – Since the NATM is based on monitoring measurements, changes in support and construction method are possible, but only if the contractual system enables them. Rock mass classification, ranging from very hard to very soft, determines the minimum support measures required and avoids economic waste that comes from needlessly strong support measures. Support system designs exist for each of the main rock classes. These serve as the guidelines for tunnel reinforcement. Based on the computation of the optimal cross section, only a thin shotcrete protection is necessary. It is applied immediately behind the excavated tunnel face to create a natural load-bearing ring and minimize the rock's deformation. Geotechnical instruments are installed to measure the later deformation of excavation. Monitoring of the stress distribution within the rock is possible. This monitoring makes the method very flexible, even if teams encounter unexpected changes in the geomechanical rock consistency, e.g. by crevices or pit water. Reinforcement is done by wired concrete that can be combined with steel ribs or lug bolts, not with thicker shotcrete. The measured rock properties suggest the appropriate tools for tunnel strengthening, where support requirements can traditionally be estimated using the RMR or Q System. Since the turn of the 21st century, NATM has been used for soft ground excavations and making tunnels in porous sediments. NATM enables immediate adjustments in the construction details, but requires a flexible contractual system to support such changes.

Variant names NATM was originally developed for use in the Alps, where tunnels are commonly excavated at depth and in high in situ stress conditions. The principles of NATM are fundamental to modern-day tunnelling, and NATM fundamentally involves specifically addressing the specific soil conditions being encountered. Most city tunnels are built at shallow depth and do not need to control the release of in situ stress, as was the case with the original NATM in the Alps. Projects in cities place a higher priority on minimizing settlement and so tend to use different support methods from the original NATM. That has led to a confusion in terminology in that tunnelling engineers use "NATM" to mean different things. New terms have arisen, and alternative names for certain aspects of NATM have been adopted as its use has spread. That is partly caused by an increased use of the tunneling method in the United States, particularly in soft ground shallow tunnels. Other designations are seen for this modern tunneling style; Sequential Excavation Method (SEM) or Sprayed Concrete Lining (SCL) are often used in shallower tunnels. In Japan, the terms Centre Dividing Wall NATM or Cross Diaphragm Method (both abbreviated to CDM) and Upper Half Vertical Subdivision method (UHVS) are used. The Austrian Society of Engineers and Architects defines NATM as "a method where the surrounding rock or soil formations of a tunnel are integrated into an overall ring-like support structure. Thus the supporting formations will themselves be part of this supporting structure." Some engineers use NATM whenever they propose shotcrete for initial ground support of an open-face tunnel. The term NATM can be misleading in relation to soft-ground tunnels. As noted by Emit Brown, NATM can refer to both a design philosophy and a construction method.

Key features Key features of the NATM design philosophy are:

… excerpt ends here. Continue reading the full article.

Worked examples

Example 1 — a first encounter with New Austrian tunneling method

Start with the simplest possible case. Write down what New Austrian tunneling method claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In science, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to New Austrian tunneling method before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about New Austrian tunneling method ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of New Austrian tunneling method

In research
New Austrian tunneling method appears in science research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses New Austrian tunneling method in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
New Austrian tunneling method is common in secondary-school and first-year university syllabi. It links to neighbouring topics 1960s establishments in Austria, 1960s introductions, Austrian inventions, so understanding it makes those chapters shorter.
In everyday life
Look for New Austrian tunneling method outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study New Austrian tunneling method in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what New Austrian tunneling method means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain New Austrian tunneling method out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is New Austrian tunneling method in simple terms?

The new Austrian tunneling method (NATM), also known as the sequential excavation method (SEM) or sprayed concrete lining method (SCL), Neue Österreichische Tunnelbaumethode (NÖT) in German, is a method of modern tunnel design and construction employing sophisticated monitoring to optimize various…

Why does New Austrian tunneling method matter?

Because it connects several science ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study New Austrian tunneling method?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on New Austrian tunneling method.

Tags

  • 1960s establishments in Austria
  • 1960s introductions
  • Austrian inventions
  • Rock mass classification
  • Tunnel construction

Keep exploring