ArticleslgStudy

engineering

New Croton Dam

New Croton Dam is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand New Croton Dam rather than just read about it. In short: The New Croton Dam is a masonry gravity dam forming the New Croton Reservoir, both parts of the New York City water supply system. It stretches across the Croton River near Croton-on-Hudson, New York, about 22 miles (35 km) north of New York City.

New Croton Dam — main illustration
New Croton Dam — illustration

Key takeaways

  • New Croton Dam belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect New Croton Dam to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of New Croton Dam from memory before moving on to harder problems.

Reference excerpt

The New Croton Dam is a masonry gravity dam forming the New Croton Reservoir, both parts of the New York City water supply system. It stretches across the Croton River near Croton-on-Hudson, New York, about 22 miles (35 km) north of New York City. Construction began in 1892 and was completed in 1906. Designed by Alphonse Fteley (1837–1903), the masonry dam is 266 feet (81 m) broad at its base and 297 feet (91 m) high from base to crest. At the time of its completion, it was the tallest dam in the world. It impounds up to 19 billion US gallons (72,000,000 m3) of water, a small fraction of the New York City water system's total storage capacity of 580 billion US gallons (2.2×109 m3).

History

Background The original Croton Dam (Old Croton Dam) was built between 1837 and 1842 to improve New York City's water supply. By 1881, after extensive repairs to the dam, which was 50 feet (15 m) high, the Old Croton Reservoir was able to supply about 90 million US gallons (340,000 m3) a day to the city via the Old Croton Aqueduct. To meet escalating water needs, the Aqueduct Commission of the City of New York ordered construction of a new Croton system in 1885. Hydro engineer James B. Francis was brought in as a consultant for the construction. The proposed dam would be downstream from the old dam but taller, so the old dam would remain in place, totally submerged by the new reservoir, which was to cover 20 square miles (52 km2) of land occupied by public and private buildings, six cemeteries, and more than 400 farms. Condemnation disputes led to "protests, lawsuits, and confusion" before payment of claims and the awarding of construction contracts. The work force on the new dam included stonemasons and laborers who had worked on the original dam. John B. Goldsborough, superintendent of excavations and hiring for the project, also recruited stonemasons from southern Italy, who re-located to New York.

Construction

Construction on the New Croton Dam, also known as Cornell Dam, began in 1892 and was completed in 1906. Building the dam meant diverting the river from its normal path and pumping the riverbed dry. To accomplish this, workers dug a crescent-shaped canal 1,000 feet (300 m) long and 200 feet (61 m) wide in the hill on the north side of the river, secured the canal with a masonry retaining wall, and built temporary dams to control the water flow. The initial construction lasted eight years, and extensive modifications and repairs went on for another six. Working conditions were often difficult. A silent film, The Croton Dam Strike, released in 1900, depicted labor–management problems related to the dam's construction. Designed by Alphonse Fteley (1837–1903), the masony gravity dam is 266 feet (81 m) broad at its base and 297 feet (91 m) high from base to crest. At the time of its completion, it was the tallest dam in the world. Its foundation extends 130 feet (40 m) below the bed of the river, and the dam contains 850,000 cubic yards (650,000 m3) of masonry. The engineers' tablet mounted on the headhouse nearest the spillway lists the spillway length as 1,000 feet (300 m) and the total length of the dam and spillway combined as 2,188 feet (667 m). New Croton Dam impounds up to 19 billion US gallons (72,000,000 m3) of water, a small fraction of the New York City water system's total storage capacity of 580 billion US gallons (2.2×109 m3). Work began in 1892 at a site on the property of A.B. Cornell 4 miles (6.4 km) downstream of the original dam, which was submerged by the new reservoir. New Croton Reservoir was eventually able to supply 200 to 300 million US gallons (760,000 to 1,140,000 m3) a day via a new aqueduct that carried water to Jerome Park Reservoir in the north Bronx, New York City.

Repair

The bridge over the spillway was replaced in 1975 and again in 2005. In that same year, because of the September 11 attacks on New York City, the New York City Department of Environmental Protection proposed permanent closure of the road across the top of the dam. Pedestrians and emergency vehicles were allowed to use New Croton Dam Road, but all other traffic was re-routed. The department made plans to replace temporary vehicle barriers with permanent barriers after completion of a New Croton Dam Rehabilitation Project in 2011.

Discharge Data

U.S. Geological survey provides average daily discharge data for the Croton Dam here. Record discharge at the Croton Dam since records began in 1933 was on 1955-10-16 with 33,000 cfs (cubic feet per second); this was after dual hurricanes Connie and Diane.

Trails

Croton Gorge Park offers views of the dam from directly downstream. The Old Croton Trail, a popular hiking and biking path that roughly follows the route of the Old Croton Aqueduct, has an endpoint near the base of the dam. Teatown Lake Reservation, a nature preserve, lies nearby as does Croton Point Park in Croton-on-Hudson.

References

External links

Historic American Engineering Record (HAER) No. NY-132, "New Croton Dam & Reservoir, Croton River, Croton-on-Hudson vicinity, Westchester County, NY"

Illustrations

New Croton Dam illustration
New Croton Dam: The dam on the reservoir side
The dam on the reservoir side
New Croton Dam: Dam under construction in 1901
Dam under construction in 1901
New Croton Dam: New Croton Dam in 2016
New Croton Dam in 2016
New Croton Dam: Water over the New Croton Dam spillway after Hurricane Ida in 2021 (average daily discharge 10,100 cubic feet per second)
Water over the New Croton Dam spillway after Hurricane Ida in 2021 (average daily discharge 10,100 cubic feet per second)

Worked examples

Example 1 — a first encounter with New Croton Dam

Start with the simplest possible case. Write down what New Croton Dam claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to New Croton Dam before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about New Croton Dam ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of New Croton Dam

In research
New Croton Dam appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses New Croton Dam in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
New Croton Dam is common in secondary-school and first-year university syllabi. It links to neighbouring topics 1906 establishments in New York (state), Buildings and structures in Westchester County, New York, Croton Watershed, so understanding it makes those chapters shorter.
In everyday life
Look for New Croton Dam outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “New Croton Dam” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study New Croton Dam in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what New Croton Dam means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain New Croton Dam out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is New Croton Dam in simple terms?

The New Croton Dam is a masonry gravity dam forming the New Croton Reservoir, both parts of the New York City water supply system. It stretches across the Croton River near Croton-on-Hudson, New York, about 22 miles (35 km) north of New York City.

Why does New Croton Dam matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study New Croton Dam?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on New Croton Dam.

Tags

  • 1906 establishments in New York (state)
  • Buildings and structures in Westchester County, New York
  • Croton Watershed
  • Dams completed in 1906
  • Dams in New York (state)
  • Historic American Engineering Record in New York (state)
  • Historic Civil Engineering Landmarks
  • Masonry dams

Keep exploring