ArticleslgStudy

engineering

New River (London)

New River (London) is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand New River (London) rather than just read about it. In short: The New River is an artificial waterway in England, opened in 1613 to supply London with fresh drinking water taken from Chadwell and Amwell Springs near Ware in Hertfordshire, and later the River Lea and other sources. Originally conceived by Edmund Colthurst and completed by Hugh Myddelton, it was operated by the New River Company for nearly 300 years until London's water supply was taken over by the Metropolitan…

New River (London) — main illustration
New River (London) — illustration

Key takeaways

  • New River (London) belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect New River (London) to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of New River (London) from memory before moving on to harder problems.

Reference excerpt

The New River is an artificial waterway in England, opened in 1613 to supply London with fresh drinking water taken from Chadwell and Amwell Springs near Ware in Hertfordshire, and later the River Lea and other sources. Originally conceived by Edmund Colthurst and completed by Hugh Myddelton, it was operated by the New River Company for nearly 300 years until London's water supply was taken over by the Metropolitan Water Board in 1904. Although it was once threatened with closure, a large section of the New River remains part of London's water supply infrastructure, today operated by Thames Water, more than 400 years after it was first constructed. The New River originally followed the land contours but certain parts have been straightened over the centuries. There is a designated walking route along the canal called the New River Path. It is a 28-mile (45 km) long-distance footpath which follows the course of the New River as closely as possible from its source in Hertfordshire to its original end in Islington, London.

Route

It starts between Ware and Hertford in Hertfordshire and today runs 20 miles (32 km) down to Stoke Newington. Among the districts it flows through are (from north to south):

Great Amwell Hoddesdon Broxbourne Cheshunt Enfield Palmers Green Bowes Park Wood Green (passing close to Alexandra Palace) Hornsey Harringay Finsbury Park Its original termination, near Clerkenwell, Islington, became known as the New River Head where the water filled a large cistern – the Round Pond – next to the current location of Sadler's Wells theatre — where water from the river was used to flood a large tank to stage an Aquatic Theatre at the beginning of the nineteenth century. In 1946, the water supply to New River Head was truncated at Stoke Newington with the New River ending at the East Reservoir. The reservoir is managed as the Woodberry Wetlands – a nature reserve and designated Site of Metropolitan Importance.

Construction

The design and construction of the New River is often attributed solely to Hugh Myddelton. In 1602, Edmund Colthurst first proposed the idea of digging an artificial waterway to supply London from Chadwell and Amwell springs near Ware in Hertfordshire, and obtained a charter from King James I in 1604 to carry it out. However, much of the water was obtained from streams tapped along its route, including the Hackney Brook. After surveying the route and digging the first 2-mile (3 km) stretch, Colthurst encountered financial difficulties and it fell to Myddelton to complete the work between 1609 and its official opening on 29 September 1613. The project was also rescued by the King personally, whose house and lands at Theobalds Park were crossed by the river. James took half of the shares in 1612 for a half of the profits. The expense and engineering challenges of the project—it relied on gravity to allow the water to flow, carefully following the contours of the terrain from Ware into London, and dropping around just five inches per mile (8 cm/km)—were not Myddelton's only worries. He also faced considerable opposition from landowners who feared that the New River would reduce the value of their farmland (they argued that floods or overflowing might create quagmires that could trap livestock); others were concerned at the possible disruption to road transport networks between Hertfordshire and the capital. The project nearly foundered when a few landowners flatly refused to agree to allow the river across their land. When it was originally constructed, long sections, for example around Forty Hall and in Hornsey, wound around the heads of small tributary valleys of the Lea. Other sections of the river, including the one in Harringay, were carried across valleys in wooden aqueducts lined with lead and supported by strong timbers and brick piers. In at least one section, locals referred to the river as the boarded river. Improvements in canal construction in the eighteenth century led to these sections being replaced by clay-banked canals. In 1620, the New River Company found that the springs were not sufficient to supply their customers, and dug a half-mile extension to feed the New River from the nearby River Lea to supplement the water from the springs. A mechanical gauge regulates the amount taken. On 9 January 1622 King James rode from Theobalds after dinner to see the ice on the New River and fell in head first so that his companions could only see his boots. He was rescued by Sir Richard Young and returned to a warm bed at Theobalds.

Later alterations

Originally the New River's course was above ground throughout, but in the second half of the 19th century some sections were put underground, enabling the course to be straightened. A winding original section of the channel that used to run through the town centre of Enfield has been cut off from the main flow, but is still maintained as an important local civic amenity called the New River Loop. The New River was returned to its original course along the Enfield Loop for a period between 1940 and 1952 after a bomb hit the pipes run to divert it. Another large loop originally ran around the Devonshire Hill area in north Wood Green and southern Enfield. This loop was cut off when the Wood Green tunnel, which starts at Bowes Park, was completed in 1852. The loop existed for some decades, but was completely filled in and lost by the early 1900s. Now entirely covered by residential development dating mostly back to the 1930s, its former course is visible on numerous maps drawn in the 1800s and early 1900s. In March 1946, the last filter beds at New River Head were decommissioned to make way for the Metropolitan Water Board's new offices, and the section of the New River south of Stoke Newington was abandoned. In 1950, the pipes used to carry the water in this section were excavated, and some were reused elsewhere in the water supply network. The New River Aqueduct (51°40'58.6"N 0°03'16.0"W) was built in 1985 to carry the New River, then running on an embankment, over the London Orbital Motorway (M25) which was then being constructed. The aqueduct carries the river in two parallel concrete boxes each 90 m long, 4.25 m wide and 2 m deep. The double box design allowed the temporary diversion of the river during construction and also enables maintenance to be undertaken on either side without stopping the flow.

… excerpt ends here. Continue reading the full article.

Worked examples

Example 1 — a first encounter with New River (London)

Start with the simplest possible case. Write down what New River (London) claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to New River (London) before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about New River (London) ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of New River (London)

In research
New River (London) appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses New River (London) in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
New River (London) is common in secondary-school and first-year university syllabi. It links to neighbouring topics 1613 establishments in England, Aqueducts in England, Buildings and structures completed in 1613, so understanding it makes those chapters shorter.
In everyday life
Look for New River (London) outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “New River (London)” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study New River (London) in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what New River (London) means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain New River (London) out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is New River (London) in simple terms?

The New River is an artificial waterway in England, opened in 1613 to supply London with fresh drinking water taken from Chadwell and Amwell Springs near Ware in Hertfordshire, and later the River Lea and other sources. Originally conceived by Edmund Colthurst and completed by Hugh Myddelton, it wa…

Why does New River (London) matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study New River (London)?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on New River (London).

Tags

  • 1613 establishments in England
  • Aqueducts in England
  • Buildings and structures completed in 1613
  • Canals opened in the 17th century
  • Geography of the London Borough of Enfield
  • Geography of the London Borough of Hackney
  • Geography of the London Borough of Haringey
  • Geography of the London Borough of Islington
  • Lea catchment
  • London water infrastructure
  • Parks and open spaces in the London Borough of Enfield
  • Parks and open spaces in the London Borough of Hackney

Keep exploring