Oosterscheldekering

Oosterscheldekering is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Oosterscheldekering rather than just read about it. In short: The Oosterscheldekering (pronounced [oːstərˌsxɛldəˈkeːrɪŋ] English: Eastern Scheldt barrier), between the islands Schouwen-Duiveland and Noord-Beveland, is the largest of the Delta Works, a series of dams and storm surge barriers designed to protect the Netherlands from flooding from the North Sea. The construction of the Delta Works was a response to the widespread damage and loss of life in the North Sea flood of…

Oosterscheldekering — main illustration
Oosterscheldekering — illustration

Key takeaways

  • Oosterscheldekering belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Oosterscheldekering to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Oosterscheldekering from memory before moving on to harder problems.

Reference excerpt

The Oosterscheldekering (pronounced [oːstərˌsxɛldəˈkeːrɪŋ] English: Eastern Scheldt barrier), between the islands Schouwen-Duiveland and Noord-Beveland, is the largest of the Delta Works, a series of dams and storm surge barriers designed to protect the Netherlands from flooding from the North Sea. The construction of the Delta Works was a response to the widespread damage and loss of life in the North Sea flood of 1953.

Surge barrier The second longest dam in the Delta Works, after the 10.5-kilometre-long Oesterdam, the nine-kilometre-long Oosterscheldekering (kering meaning barrier) was initially designed, and partly built, as a closed dam, but after public protests, huge sluice-gate-type doors were installed in the remaining four kilometres. These doors are normally open, but can be closed under adverse weather conditions. In this way, the saltwater marine life behind the dam is preserved and fishing can continue, while the land behind the dam is safe from the water. Notable figures involved in the design of the Oosterscheldekering included Jan Agema, and from 1976 the design of the project was led by Frank Spaargaren. On 4 October 1986, Queen Beatrix officially opened the dam for use by saying the well-known words: "De stormvloedkering is gesloten. De Deltawerken zijn voltooid. Zeeland is veilig." (The flood barrier is closed. The Delta Works are completed. Zeeland is safe.) At the artificial island Neeltje-Jans, at one end of the barrier, a plaque is installed with the words: "Hier gaan over het tij, de maan, de wind en wij" ("Here, ruling of the tide of the sea, is done by the moon, the wind and we").

Construction

The Oosterscheldekering was the most difficult to build and most expensive part of the Delta works. Work on the dam took more than a decade. It was constructed by a consortium of contractors comprising Ballast Nedam, Royal Boskalis, Baggermaatschappij Breejenhout, Hollandse Aanneming Maatschappij, Hollandse Beton Maatschappij, Van Oord-Utrecht, Stevin Baggeren, Stevin Beton en Waterbouw, Adriaan Volker Baggermaatschappij, Adriaan Volker Beton en Waterbouw and Aannemerscombinatie Zinkwerken. Construction started in April 1976 and was completed in June 1986. The road over the dam was ready for use in November 1987. The road was opened by Princess Juliana of the Netherlands on 5 November 1987, exactly 457 years after the St Felix Day's flood of 1530, which had washed away a large chunk of Zeeland, upstream of the new barrier's position. To facilitate the building, an artificial island, Neeltje-Jans, was created in the middle of the estuary. When the construction was finished, the island was rebuilt to be used as education centre for visitors and as a base for maintenance works. The dam is based on 65 concrete pillars with 62 steel doors, each 42 meters wide. The parts were constructed in a dry dock. The area was flooded and a small fleet of special construction ships lifted the pillars and placed them in their final positions. Each pillar is between 35 and 38.75 metres high and weighs 18000 tonnes. The dam is designed to last more than 200 years. The Oosterscheldekering is sometimes referred to as the eighth Wonder of the World. It has been declared one of the modern Seven Wonders of the World by the American Society of Civil Engineers.

Construction fleet

Four ships were custom designed and built for this project:

Mytilus, a ship equipped with various ground working tools, such as needles to make the seabed denser and more stable. Cardium, a ship to transport and lay a special foil carpet on the seabed for the pillars to rest on. Ostrea, a ship capable of lifting a concrete pillar from the dry dock and placing it accurately on a special foil on the seabed. The ship is 85 metres long and has a portal 50 metres high. The ship can only lift 10,000 tonnes, but as a large part of the pillar is underwater, it is not necessary for the ship to be able to lift the full 18,000 tonnes. This ship is considered the flagship of the construction fleet, mainly because of its larger size and power in comparison to the other ships. Macoma, a ship that works closely with the Ostrea, cleaning the foil assisting in placing the pillars accurately in their final position. The ships are named after various types of shellfish.

Operation The dam is manually operated but if human control fails, an electronic security system acts as a backup. A Dutch law regulates the conditions under which the dam is allowed to close. The water levels must be at least three meters above regular sea level before the doors can be completely shut. Each sluice gate is closed once a month for testing. Emergency procedures are tested on pre-scheduled dates. Once the test is passed, the shutters are quickly opened again to create a minimum amount of effect on tidal movements and the local marine ecosystem. It takes approximately one hour to close a door. The cost of operation is €17 million per year. The full dam has been closed twenty-eight times since 1986, due to water levels exceeding or being predicted to exceed three metres. The last time was on January 31 2022, because of Storm Corrie.

Tidal power generation In 2015, five Tocardo T2 tidal turbines were installed on the barrier, mounted on a 50 m long frame supported by the road bridge, which could rotate to lift all of the turbines out the water simultaneously. The turbines were installed in the eighth sluice channel from the southern end of the barrier, and started generating electricity to the Dutch grid in 2016. The installation was reported to have cost around US$12.4 million, and was the largest tidal power project in the Netherlands. Each turbine was 5.26 m in diameter (87 m² swept area) and rated at 250 kW for a total power of 1.25 MW. The project was decommissioned after eight years of operation in 2023.

Further reading Kohl, Larry (October 1986). "The Oosterschelde Barrier – Man Against the Sea". National Geographic. Vol. 170, no. 4. pp. 526–37. ISSN 0027-9358. OCLC 643483454.

See also Flood control in the Netherlands Delta Works Rijkswaterstaat Jan Agema Frank Spaargaren

References

External links Media related to Oosterscheldekering at Wikimedia Commons Satellite view from Google Maps DeltaWorks.org – DeltaWorks.Org about Oosterscheldekering. Includes text, photos, video and virtual tour.

Illustrations

Oosterscheldekering: One of the three movable barrier sections of the Oosterscheldekering during a storm
One of the three movable barrier sections of the Oosterscheldekering during a storm
Oosterscheldekering: Topographical map of the Oosterscheldedam. Alternatingly it consists of five sections: three movable flood barriers and two artificial islands.
Topographical map of the Oosterscheldedam. Alternatingly it consists of five sections: three movable flood barriers and two artificial islands.
Oosterscheldekering: Oosterscheldekering (center)
Oosterscheldekering (center)
Oosterscheldekering: North-eastern section of Oosterscheldekering
North-eastern section of Oosterscheldekering
Oosterscheldekering: Detailed view of the Oosterscheldekering
Detailed view of the Oosterscheldekering

Worked examples

Example 1 — a first encounter with Oosterscheldekering

Start with the simplest possible case. Write down what Oosterscheldekering claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Oosterscheldekering before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Oosterscheldekering ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Oosterscheldekering

In research
Oosterscheldekering appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Oosterscheldekering in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Oosterscheldekering is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures in Schouwen-Duiveland, Dams completed in 1986, Dams in Zeeland, so understanding it makes those chapters shorter.
In everyday life
Look for Oosterscheldekering outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Oosterscheldekering” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Oosterscheldekering in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Oosterscheldekering means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Oosterscheldekering out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Oosterscheldekering in simple terms?

The Oosterscheldekering (pronounced [oːstərˌsxɛldəˈkeːrɪŋ] English: Eastern Scheldt barrier), between the islands Schouwen-Duiveland and Noord-Beveland, is the largest of the Delta Works, a series of dams and storm surge barriers designed to protect the Netherlands from flooding from the North Sea…

Why does Oosterscheldekering matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Oosterscheldekering?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Oosterscheldekering.

Tags

  • Buildings and structures in Schouwen-Duiveland
  • Dams completed in 1986
  • Dams in Zeeland
  • Delta Works
  • Flood barriers
  • Noord-Beveland
  • Tourist attractions in Zeeland