Paris Metro Line 14 (French: Ligne 14 du métro de Paris) is one of the sixteen lines currently open on the Paris Métro. It connects Saint-Denis–Pleyel and Aéroport d'Orly on a northwest–southeast diagonal via the three major stations of Gare Saint-Lazare, the Châtelet–Les-Halles complex, and Gare de Lyon. The line goes through the centre of Paris and also serves the communes of Saint-Denis, Saint-Ouen-sur-Seine, Clichy, Le Kremlin-Bicêtre, Gentilly, Villejuif, Chevilly-Larue, L'Haÿ-les-Roses, Thiais and Paray-Vieille-Poste. The first Paris Métro line built from scratch since the 1930s, line 14 has been operated completely automatically since its opening in 1998, and the very positive return of that experiment motivated the retrofitting of Line 1 for full automation. Before the start of its commercial service Line 14 was known as project Météor, an acronym for MÉTro Est-Ouest Rapide. The line has been used as a showcase for the expertise of the RATP (the operator), Alstom, Systra and Siemens Mobility (constructors of the rolling stock and automated equipment respectively) when they bid internationally to build metro systems. A northward extension to Mairie de Saint-Ouen opened in December 2020. The line extended further north to Saint-Denis–Pleyel and south to Aéroport d'Orly, as part of the Grand Paris Express project, on 24 June 2024. Those extensions made Line 14 the longest in the Métro, at 27.8 km of length. As of Fall 2025, it is the busiest line of the Paris Metro, carrying around 820,000 riders per weekday.
Chronology 1983: RER A, which was built to desaturate Métro Line 1, also comes to saturation. A new line on the West ↔ East axis is needed. 1987: RATP and SNCF each coin new route projects to desaturate Lines 1 and A : SNCF coins project ÉOLE, an RER axis connecting the Paris-Est suburban network to Saint-Lazare with an upcoming extension westbound towards La Défense, RATP coins project MÉTEOR – a subway line connecting Porte Maillot to Porte d'Ivry alongside RER A – 1989: French Government validates ÉOLE straightaway, and sends RATP back to the drawing board. October 1989: French Prime minister of the time, Michel Rocard, validates both projects, yet limits them to their parisian section due to budget constraints : ÉOLE is a mere tunnel from Paris-Est to Saint-Lazare with the two aforementioned stations, MÉTEOR's second project – a subway line from Saint-Lazare to Maison Blanche along the Seine, with planned extensions north to Asnières by taking over line 13's northwestern branch, and south towards Orly airport – is limited at first to Madeleine north (in order to avoid supplemental charge on Line 13) and to the brand new Bibliothèque François Mitterrand station south, with the actual Olympiades station initially used as the line's depot. September 1993: Sandrine, Météor's tunnel boring machine, starts digging. 28 September 1994: RATP reuses the immerged caissons technique, 90 years after line 4, to create Méteor's tunnel under the Seine. 26 May 1997: Météor test runs begin. 15 October 1998: Météor is inaugurated as Line 14 between Madeleine and Bibliothèque François Mitterrand. It's the first modern subway line of the Paris Métro : Driverless, with 120 meters long stations equipped with platform screen doors and full access for people with reduced mobility, all from day one. 15 February 2003: while digging the first southern extension, a kindergarten's recess courtyard collapses in Paris' 13th arrondissement, halting the digging process and causing delays. 16 December 2003: northern extension from Madeleine to Saint-Lazare opens, traffic surges by 30% 26 June 2007: first southern extension from Bibliothèque François Mitterrand to Olympiades opens, with a new workshop opened further southwest towards Maison Blanche 3 March 2014: first of eighteen MP 05 trains enters into revenue service 12 October 2020: first of thirty five MP 14 trains enters into revenue service 14 December 2020: second northern extension from Saint-Lazare to Mairie de Saint-Ouen opens, except Porte de Clichy. 28 January 2021: Porte de Clichy opens to passengers, finalising RATP's attempt to use line 14 to alleviate traffic on line 13. 13 April 2023: last runs of both MP 89 and MP 05 rolling stock on the line, the two are subsequently transferred to Line 4 24 June 2024: third northern extension from Mairie de Saint-Ouen to Saint-Denis–Pleyel opens 24 June 2024: second southern extension from Olympiades to Aéroport d'Orly opens, except Villejuif–Gustave Roussy which is still in construction. 18 January 2025: Villejuif–Gustave Roussy opens for line 14, the line 15's platform still closed.
Development
Project Météor
… excerpt ends here. Continue reading the full article.