ArticleslgStudy

engineering

Piscine Molitor

Piscine Molitor is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Piscine Molitor rather than just read about it. In short: Piscine Molitor (English: Miller Swimming Pool, French pronunciation: [pisin molitɔʁ]; also known as the Piscines Auteuil-Molitor or the Grands établissements balnéaires d'Auteuil) is a swimming pool and hotel complex located in Porte Molitor, 16th arrondissement of Paris, Île-de-France, Paris, France. It is next to the Bois de Boulogne park, and between Stade Roland Garros and Parc des Princes.

Piscine Molitor — main illustration
Piscine Molitor — illustration

Key takeaways

  • Piscine Molitor belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Piscine Molitor to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Piscine Molitor from memory before moving on to harder problems.

Reference excerpt

Piscine Molitor (English: Miller Swimming Pool, French pronunciation: [pisin molitɔʁ]; also known as the Piscines Auteuil-Molitor or the Grands établissements balnéaires d'Auteuil) is a swimming pool and hotel complex located in Porte Molitor, 16th arrondissement of Paris, Île-de-France, Paris, France. It is next to the Bois de Boulogne park, and between Stade Roland Garros and Parc des Princes. The complex was built in 1929 and inaugurated by Olympic swimmers Aileen Riggin, Matthew Gauntlett and Johnny Weissmuller. The pool is known for its Art Deco designs and the popular introduction of the bikini by Louis Réard on 5 July 1946. The pool was classified as a French monument historique on 27 March 1990, after having fallen into disuse and closing in 1989. The swimming pool complex was rebuilt from scratch in the style of the previous historic design. The new complex includes two pools and a four star hotel. It opened in May 2014.

History

From around 1920–1930, Paris saw the construction of numerous new public swimming pools, although the development of aquatic recreation in France still lagged behind that of Great Britain and Germany. However, public pools also hosted bathing facilities, as many French homes did not have their own bathrooms. Piscine Molitor was built in 1929 by architect Lucien Pollet, who was working for Les Belles Piscines de France and had designed three other pool complexes. It was designed to resemble an ocean liner and was adorned with Art Deco stained glass by Louis Barillet. In the summer of 1929, Olympic athlete Johnny Weissmuller, who was a lifeguard in his spare time, officially opened Piscine Molitor. The pool often housed fashion shows, theatrical performances, and training for figure skating. In 1946, the unveiling of the first modern bikini, designed by Louis Réard, was held at Piscine Molitor, modelled by the Parisian Micheline Bernardini during a fashion show at the pool. The establishment originally comprised two pools, one indoor and the other outdoor, arranged in a T-shape. The complex was used as an ice-skating rink until the early 1970s. The complex ultimately closed in 1989. On 14 April 2001 the French soundsystem Heretik threw a free all-night party gathering inside the pool, hosting about 5000 people. The complex was the only building with two pools built by Pollet, inspired by the work of architect Robert Mallet-Stevens. Pollet also worked with master glassmaker Louis Barillet, who created the Art Deco stained glass windows adorning the pool complex. It had a conventional 33-metre (108 ft) long covered pool and an Olympic-level 50-metre (160 ft) long open-air pool. The open-air pool was turned into ice and used as a skating rink until the 1970s, and was surrounded by three levels of cabins, resembling a large ship. The complex also included a fitness room. Pollet called the complex "les Grands Établissements Balnéaires d'Auteuil" (the Great Seaside Establishment of Auteuil) because the complex was the site of various sporting events at the time, particularly on the outdoor pool, which was lined with sand. Architect Marc Mimram recently began a restoration project for the pool complex.

Building controversies

In 1989, a housing project was proposed to the City of Paris. The project was advanced by the city and called for the destruction of the pool and its rebuilding as part of a hotel, with the rest of the original pool complex being turned into a parking lot. On 31 August 1989 the pool was permanently closed. The next day, the facade and main entrance were boarded up. A group of citizens founded the "SOS Molitor", trying to prevent the pool's destruction. They were successful the next year, with the entire pool complex being listed in the inventory of the French Monuments Historiques program (and, as a result, protected by the French government). However, although saved from impending demolition, the complex experienced damage from weather, poor maintenance, and even vandalism (mainly to its historic Art Deco decor) after being protected. Various other housing projects were also stopped by the French Ministry of Culture, with their final decision on 5 August 2000 revoking the construction permit originally granted by the City of Paris. After SOS Molitor gained ownership of the complex, a new organization called Piscines Molitor was created to obtain funding for the rehabilitation and reopening of Piscine Molitor. The organization has appealed to the administrative court of Paris.

Redevelopment

In August 2007, the Mayor of Paris began to accept applications for the renovation of Piscine Molitor. On 20 November 2007 it was announced that three different groups were competing for the role of renovating the pool complex, Colony Capital, ICADE, and GTM Construction. The mayor, Bertrand Delanoë, called for the revival of the complex without spending taxpayer money. On 30 October 2008 Delanoë announced that the group Colony Capital-Accor-Bouygues had been chosen for the project, with architects Jacques Rougerie, Alain Derbesse, and Alain-Charles Perrot. The group had been planning for a 2012 reopening of the complex, but it opened on 19 May 2014. The €64.8 million project leases the property for 54 years and includes a 4-star hotel, a health center, and a medical center, as well as retail, restaurants, and parking facilities.

In popular culture The title character of Yann Martel's Man Booker Prize winning novel Life of Pi, Piscine Molitor "Pi" Patel, is named after Piscine Molitor. This book was made into a movie of the same name which was released in 2012. In the third season of Emily in Paris, the title character (Lily Collins) and her best friend Mindy (Ashley Park) have a cocktail while lounging at the Piscine Molitor. A visit to the spa and pool is also featured during the third season of Netflix TV show The Parisian Agency: Exclusive Properties. The music video for Nudes by Claire Laffut and Yseult was filmed at the complex.

References

External links

Legacy of Piscine Molitor Archived 14 June 2021 at the Wayback Machine

Illustrations

Piscine Molitor illustration
Piscine Molitor: The pool in 1933
The pool in 1933
Piscine Molitor: The pool in disrepair, 2011
The pool in disrepair, 2011
Piscine Molitor: The redeveloped pool at nighttime, 2022
The redeveloped pool at nighttime, 2022

Worked examples

Example 1 — a first encounter with Piscine Molitor

Start with the simplest possible case. Write down what Piscine Molitor claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Piscine Molitor before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Piscine Molitor ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Piscine Molitor

In research
Piscine Molitor appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Piscine Molitor in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Piscine Molitor is common in secondary-school and first-year university syllabi. It links to neighbouring topics 16th arrondissement of Paris, 1929 establishments in France, 1989 disestablishments in France, so understanding it makes those chapters shorter.
In everyday life
Look for Piscine Molitor outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Piscine Molitor” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Piscine Molitor in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Piscine Molitor means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Piscine Molitor out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Piscine Molitor in simple terms?

Piscine Molitor (English: Miller Swimming Pool, French pronunciation: [pisin molitɔʁ]; also known as the Piscines Auteuil-Molitor or the Grands établissements balnéaires d'Auteuil) is a swimming pool and hotel complex located in Porte Molitor, 16th arrondissement of Paris, Île-de-France, Paris, Fra…

Why does Piscine Molitor matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Piscine Molitor?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Piscine Molitor.

Tags

  • 16th arrondissement of Paris
  • 1929 establishments in France
  • 1989 disestablishments in France
  • Architectural controversies
  • Art Deco architecture in France
  • Buildings and structures completed in 1929
  • Buildings and structures in the 16th arrondissement of Paris
  • Hotels in Paris
  • Monuments historiques in the 16th arrondissement of Paris
  • Sports venues in Paris
  • Swimming venues in France

Keep exploring