ArticleslgStudy

engineering

Power system operations and control

Power system operations and control is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Power system operations and control rather than just read about it. In short: Power system operations is a term used in electricity generation to describe the process of decision-making on the timescale from one day (day-ahead operation) to minutes prior to the power delivery. The term power system control describes actions taken in response to unplanned disturbances (e.g., changes in demand or equipment failures) in order to provide reliable electric supply of acceptable quality.

Power system operations and control — main illustration
Power system operations and control — illustration

Key takeaways

  • Power system operations and control belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Power system operations and control to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Power system operations and control from memory before moving on to harder problems.

Reference excerpt

Power system operations is a term used in electricity generation to describe the process of decision-making on the timescale from one day (day-ahead operation) to minutes prior to the power delivery. The term power system control describes actions taken in response to unplanned disturbances (e.g., changes in demand or equipment failures) in order to provide reliable electric supply of acceptable quality. The corresponding engineering branch is called Power System Operations and Control. Electricity is hard to store, so at any moment the supply (generation) should be balanced with demand ("grid balancing"). In an electrical grid, the task of real-time balancing is performed by a regional-based control center, run by an electric utility in the traditional (vertically integrated) electricity market. In the restructured North American power transmission grid, these centers belong to the balancing authorities, of which 74 existed in 2016. The entities responsible for operations are also called independent system operators or transmission system operators. The other form of balancing resources of multiple power plants is a power pool. The balancing authorities are overseen by reliability coordinators.

Day-ahead operation

Day-ahead operation schedules the generation units that can be called upon to provide the electricity on the next day (unit commitment). The dispatchable generation units can produce electricity on demand and thus can be scheduled with accuracy. The production of the weather-dependent variable renewable energy for the next day is not certain, its sources are thus non-dispatchable. This variability, coupled with uncertain future power demand and the need to accommodate possible generation and transmission failures requires scheduling of operating reserves that are not expected to produce electricity, but can be dispatched on a very short notice. Some units have unique features that require their commitment much earlier: for example, the nuclear power stations take a very long time to start, while hydroelectric plants require planning of water resources usage far in advance. Therefore, commitment decisions for these are made weeks or even months before prior to delivery. For a "traditional" vertically integrated electric utility the main goal of the unit commitment is to minimize both the marginal cost of producing the unit of electricity and the (quite significant for fossil fuel generation) start-up costs. In a "restructured" electricity market a market clearing algorithm is utilized, frequently in a form of an auction; the merit order is sometimes defined not just by the monetary costs, but also by the environmental concerns. Unit commitment is more complex than the shorter-time-frame operations, since unit availability is subject to multiple constraints:

demand-supply balance needs to be maintained, including sufficient spinning reserves for contingency. The balance needs to reflect the transmission constraints; thermal units might have limits on minimum uptime (once switched on, cannot be turned off quickly) and downtime (once stopped, cannot be quickly restarted again); "must-run" units have to run due to technical constraints (for example, combined heat and power plants must run if their heat is needed); there is usually a single crew at the plant that needs to be present during a thermal unit start-up, so only one unit can be started at a time.

Hours-ahead operation

In the hours prior to the delivery, a system operator might need to deploy additional supplemental reserves or even commit more generation units, primarily to ensure the reliability of the supply while still trying to minimize the costs. At the same time, operator must ensure that enough reactive power reserves are available to prevent a voltage collapse.

Dispatch curve

The decisions ("economic dispatch") are based on the dispatch curve, where the X-axis constitutes the system power, intervals for the generation units are placed on this axis in the merit order with the interval length corresponding to the maximum power of the unit, Y-axis values represent the marginal cost (per-MWh of electricity, ignoring the startup costs). For cost-based decisions, the units in the merit order are sorted by the increasing marginal cost. The graph on the right describes an extremely simplified system, with three committed generator units (fully dispatchable, with constant per-MWh cost):

unit A can deliver up to 120 MW at the cost of $30 per MWh (from 0 to 120 MW of system power); unit B can deliver up to 80 MW at $60/MWh (from 120 to 200 MW of system power); unit C is capable of 50 MW at $120/MWh (from 200 to 250 MW of system power). At the expected demand is 150 MW (a vertical line on the graph), unit A will be engaged at full 120 MW power, unit B will run at the dispatch level of 30 MW, unit C will be kept in reserve. The area under the dispatch curve to the left of this line represents the cost per hour of operation (ignoring the startup costs, $30 * 120 + $60 * 30 = $5,400 per hour), the incremental cost of the next MWh of electricity ($60 in the example, represented by a horizontal line on the graph) is called system lambda (thus another name for the curve, system lambda curve). In real systems the cost per MWh usually is not constant, and the lines of the dispatch curve are therefore not horizontal (typically the marginal cost of power increases with the dispatch level, although for the combined cycle power plants there are multiple cost curves depending on the mode of operation, so the power-cost relationship is not necessarily monotonic).

If the minimum level of demand in the example will stay above 120 MW, the unit A will constantly run at full power, providing baseload power, unit B will operate at variable power, and unit C will need to be turned on and off, providing the "intermediate" or "cycling" capacity. If the demand goes above 200 MW only occasionally, the unit C will be idle most of the time and will be considered a peaking power plant (a "peaker"). Since a peaker might run for just tens of hours per year, the cost of peaker-produced electricity can be very high in order to recover the capital investment and fixed costs (see the right side of a hypothetical full-scale dispatch curve).

… excerpt ends here. Continue reading the full article.

Worked examples

Example 1 — a first encounter with Power system operations and control

Start with the simplest possible case. Write down what Power system operations and control claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Power system operations and control before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Power system operations and control ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Power system operations and control

In research
Power system operations and control appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Power system operations and control in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Power system operations and control is common in secondary-school and first-year university syllabi. It links to neighbouring topics Electric power generation, Electric power infrastructure, Power engineering, so understanding it makes those chapters shorter.
In everyday life
Look for Power system operations and control outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Power system operations and control in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Power system operations and control means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Power system operations and control out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Power system operations and control in simple terms?

Power system operations is a term used in electricity generation to describe the process of decision-making on the timescale from one day (day-ahead operation) to minutes prior to the power delivery. The term power system control describes actions taken in response to unplanned disturbances (e.g…

Why does Power system operations and control matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Power system operations and control?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Power system operations and control.

Tags

  • Electric power generation
  • Electric power infrastructure
  • Power engineering
  • Power station technology

Keep exploring