ArticleslgStudy

mathematics

Prelude FLNG

Prelude FLNG is a mathematics topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Prelude FLNG rather than just read about it. In short: Prelude FLNG is a floating liquefied natural gas (FLNG) platform owned by Shell plc and built by the Technip–Samsung Consortium (TSC) in South Korea for a joint venture between Royal Dutch Shell, KOGAS, and Inpex. The hull was launched in December 2013.

Key takeaways

  • Prelude FLNG belongs to mathematics; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Prelude FLNG to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Prelude FLNG from memory before moving on to harder problems.

Reference excerpt

Prelude FLNG is a floating liquefied natural gas (FLNG) platform owned by Shell plc and built by the Technip–Samsung Consortium (TSC) in South Korea for a joint venture between Royal Dutch Shell, KOGAS, and Inpex. The hull was launched in December 2013. It is 488 metres (1,601 ft) long, 74 metres (243 ft) wide, 105 m (344 ft) tall, and made with more than 260,000 tonnes of steel, beating Seawise Giant (the previous record holder) as the world's longest vessel. The vessel displaces around 600,000 tonnes when fully loaded, more than five times the displacement of a Nimitz-class aircraft carrier. It is the world's largest FLNG platform, as well as the largest FLNG facility constructed to date.

Construction The main double-hulled structure was built by the Technip Samsung Consortium in the Samsung Heavy Industries Geoje shipyard in South Korea. Construction was officially started when the first metal was cut for the substructure in October 2012. The Turret Mooring System was subcontracted to SBM and built in Drydocks World Dubai, United Arab Emirates. The MEG (monoethylene glycol) reclamation unit by Fjords Processing Norway and built in South Korea is the only topside module subcontracted. Other equipment such as subsea wellheads were constructed at other locations around the world. It was launched on 30 November 2013 with no superstructure (accommodation and process plant). The vessel is moored by its turret to 16 seabed driven steel piles, each 65 m (213 ft) long and 5.5 m (18 ft) in diameter. Subsea equipment was built by FMC Technologies, and Emerson is the main supplier of automation systems and uninterruptible power supply systems. By July 2015, all 14 gas plant modules were installed.

Cost and funding Prelude FLNG was approved for funding by Shell in 2011. Analyst estimates in 2013 for the cost of the vessel were between US$10.8 to $12.6 billion. Shell estimated in 2014 that the project would cost up to US$3.5 billion per million tons of production capacity. Competitive pressures from an increase in the long-term production capabilities of North American gas fields due to hydraulic fracturing technologies and increasing Russian export capabilities may reduce the actual profitability of the venture from what was anticipated in 2011. In 2021, the WAToday news website reported that it was believed that the ship had cost at least US$17.5 billion, though Shell has never confirmed the actual cost.

Operations The Prelude FLNG system was built for use in the Prelude and Concerto gas fields in the Browse LNG Basin, 200 kilometres (120 mi) off the coast of Western Australia; drilling and gas production were planned to begin in 2016. The system has a planned life expectancy of 25 years. The Prelude and Concerto fields are expected to produce 5.3 million tonnes of liquid and condensate per year; this includes 3.6 million tonnes of liquefied natural gas, 1.3 million tonnes of condensate, and 400,000 tonnes of liquefied petroleum gas. Natural gas will be extracted from wells and liquefied by chilling it to −162 °C (−260 °F). The ability to produce and offload LNG to large LNG carriers is an important innovation, which reduces costs and removes the need for long pipelines to land-based LNG processing plants. However, fitting all the equipment onto a single floating facility was a significant challenge. The system is designed to withstand Category 5 cyclones, although workers may be evacuated before that on an EC225 rescue helicopter. According to plans, it will produce 110,000 BOE per day. On 25 July 2017, after a journey of 5,800 km (3,600 mi) from its construction site in South Korea, Prelude arrived on site in Western Australian waters. It was expected to become operational in 2018. On 26 December 2018, Royal Dutch Shell announced that initial production had begun at Prelude. Shell said that wells had been opened and that the start-up and ramp-up phases were underway. Prelude was shut down in February 2020 after a reported electrical problem. The platform had previously suffered two incidents that saw the unintended release of gas, which NOPSEMA described as "dangerous". It restarted production in January 2021. The ship's electrical supply was disrupted by a small fire on 2 December 2021. This led to the cessation of production and the evacuation of most of the crew. As a result of repeated environmental and safety mishaps, NOPSEMA ordered the supermajor not to resume production for an indefinite period of time, pending Shell's ability to prove updated practices. According to NOPSEMA, Shell "did not have a sufficient understanding of the risks of the power system on the facility, including failure mechanisms, interdependencies, and recovery", adding that "power loss directly impacted critical safety systems along with the ability to safely evacuate crew by boat or helicopter." In April 2022, the vessel resumed operations. Operations were again partially stopped and then fully stopped during a strike which lasted 11 weeks until 25 August 2022.

References

External links Sullivan, Robert (31 October 2014). "The Biggest Ship in the World (Though It Isn't Exactly a Ship)". The New York Times. Shell: Prelude's maiden voyage on YouTube

Worked examples

Example 1 — a first encounter with Prelude FLNG

Start with the simplest possible case. Write down what Prelude FLNG claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In mathematics, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Prelude FLNG before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Prelude FLNG ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Prelude FLNG

In research
Prelude FLNG appears in mathematics research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Prelude FLNG in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Prelude FLNG is common in secondary-school and first-year university syllabi. It links to neighbouring topics Floating production storage and offloading vessels, IMO numbers, Liquefied natural gas, so understanding it makes those chapters shorter.
In everyday life
Look for Prelude FLNG outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Prelude FLNG” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Prelude FLNG in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Prelude FLNG means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Prelude FLNG out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Prelude FLNG in simple terms?

Prelude FLNG is a floating liquefied natural gas (FLNG) platform owned by Shell plc and built by the Technip–Samsung Consortium (TSC) in South Korea for a joint venture between Royal Dutch Shell, KOGAS, and Inpex. The hull was launched in December 2013.

Why does Prelude FLNG matter?

Because it connects several mathematics ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Prelude FLNG?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Prelude FLNG.

Tags

  • Floating production storage and offloading vessels
  • IMO numbers
  • Liquefied natural gas
  • Natural gas platforms
  • Shell plc
  • Ships built by Samsung Heavy Industries

Keep exploring