ArticleslgStudy

engineering

Ray Wedgwood

Ray Wedgwood is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Ray Wedgwood rather than just read about it. In short: Raymond John Lloyd Wedgwood (27 May 1942 – 5 March 2020) was an Australian engineer who served as the Chief Bridge Engineer of the Department of Main Roads and the Roads & Traffic Authority in New South Wales. He designed and supervised the construction of many major bridges across New South Wales and led the design team for the cable stayed Anzac Bridge in Sydney.

Ray Wedgwood — main illustration
Ray Wedgwood — illustration

Key takeaways

  • Ray Wedgwood belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Ray Wedgwood to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Ray Wedgwood from memory before moving on to harder problems.

Reference excerpt

Raymond John Lloyd Wedgwood (27 May 1942 – 5 March 2020) was an Australian engineer who served as the Chief Bridge Engineer of the Department of Main Roads and the Roads & Traffic Authority in New South Wales. He designed and supervised the construction of many major bridges across New South Wales and led the design team for the cable stayed Anzac Bridge in Sydney. He also played a pivotal role in the development of a common code of bridge design practice used by all Australian state road authorities.

Early life Wedgwood was born in Dorrigo, New South Wales, and grew up in nearby Bellingen. He was educated at Coffs Harbour High School and, on completing his secondary education, was awarded a cadetship by the Department of Main Roads (DMR) to attend the University of Sydney to study civil engineering.

Career After graduating with a Bachelor of Civil Engineering (Hons) degree in 1963 Wedgwood commenced employment in the DMR's Bridge Section in Sydney where his first bridge design involvement was for a curved reinforced concrete box section bridge over the F3 Motorway at Mount White. This bridge was one of the first curved structures designed by the authority. Soon after he was appointed as the Resident Engineer to supervise the construction of Captain Cook Bridge over the Georges River at Taren Point. On completion of the Captain Cook Bridge he returned to the DMR bridge design section where he developed the design for a major composite steel and concrete box girder bridge on what was then the Hume Highway over the Nepean River at Camden, later to be known as Macarthur Bridge. This design adopted an innovative form of prestressing in which the continuous steel trapezoidal box girder sets would be set up with cambers of 60 inches at the center of the six-span set. After casting, the concrete deck would then be lowered by a controlled process to redistribute the stresses, matching the positive and negative bending moment capacities of the sections. Having completed the design Wedgwood was appointed as the Resident Engineer charged with supervision of the construction of the bridge. In 1987, Wedgwood was appointed as the Chief Bridge Engineer of the DMR shortly before the department was merged with others to form the Roads & Traffic Authority. Wedgwood became the Chief Bridge Engineer of the new authority. It was a time when both the New South Wales and Federal governments were making major investments in road development. A series of projects aimed at duplicating the Hume Highway between Sydney and Melbourne were underway and a new proposal to duplicate the Pacific Highway from north of Newcastle to Brisbane was being developed. Together with major urban road development these initiatives saw record spending on roads and bridges and the need to develop designs for many major bridge structures. In the late 1980s, Wedgwood was appointed as the New South Wales representative on the Austroads committee that was working to develop a new bridge design code to be used by all the Australian state road authorities. By the early 1990s Wedgwood had become the chair of that committee and in 1992 the new code was released. It was the first bridge design code in Australia to be based on limit state design. Continuing as the chair of the committee Wedgwood further developed the code to the point when it could be re-released as Australian Standard (AS 1500) for bridge design in 2004, at which time Austroads awarded Wedgwood the Austroads Medal for his work. When the NSW Government charged the RTA with developing proposals to extend the Western Distributor freeway on the western approach to the Sydney CBD a solution needed to be found for a crossing of Blackwattle Bay at Glebe Island. The existing bridge at that location had been constructed in 1903, provided only four lanes of traffic and, as an opening swing span bridge, caused frequent stoppages in traffic. Regular use of the channel under the bridge by large cargo ships and the presence of underwater power supply cables prevented the new bridge from being a multi span structure. After a suggestion made by Fritz Leonhardt on a visit to Sydney, Wedgwood and his design team chose a cable stayed design for the new long span bridge. The choice was controversial, with some critics claiming that the proposed solution was too grand and too expensive for the location. Despite the criticisms Wedgwood persisted with the proposal and eventually the NSW Government made a commitment to the project, with the construction company Baulderstone Hornibrook appointed as the builders. The bridge was opened to traffic on 3 December 1995 as the Glebe Island Bridge. It was later renamed Anzac Bridge on 11 November 1998. In 1999, Wedgwood was appointed as the General Manager of Technical Services at the RTA responsible for delivering all aspects of road, bridge pavement and traffic engineering services to the organisation, a position he held until his retirement in 2004.

Later life After his retirement from the RTA in 2004 Wedgwood became an ex-officio member of the organisation's Heritage Committee and took an active role in developing improved methods of preserving heritage bridges. He also spoke publicly on matters of bridge history being a frequent guest on the Australia All Over radio program on ABC Radio. Between 2008 and 2011, together with another former NSW Chief Bridge Engineer, Brian Pearson, he provided technical advice to the ACT Government about the heritage issues and structural refurbishment of the historic timber truss bridge over the Murrumbidgee River at Tharwa. Between 2012 and 2018, he and Brian Pearson argued for the retention of the historic Windsor Bridge as a heritage structure when it was facing demolition as part of the bridge replacement program. The new bridge and approaches cut into Thompson Square in Windsor damaging what is widely regarded as an important feature of early colonial history. He also contributed to several book on heritage bridge issues, notably Bridging Sydney, a history of the Sydney Harbour Bridge (2006), and The Timber Truss Bridge Book (2019). Wedgwood died at Beverly Hills, Sydney on 5 March 2020. In July 2022 the New South Wales Government named the Morgan Rd overbridge at Mt White on the M1 Motorway in his honour, recognising his contribution to the transport industry and the community.

Awards 1982 – Warren Medal, Institution of Engineers Australia 2004 – Austroads Medal, Austroads

References

… excerpt ends here. Continue reading the full article.

Illustrations

Ray Wedgwood illustration

Worked examples

Example 1 — a first encounter with Ray Wedgwood

Start with the simplest possible case. Write down what Ray Wedgwood claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Ray Wedgwood before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Ray Wedgwood ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Ray Wedgwood

In research
Ray Wedgwood appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Ray Wedgwood in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Ray Wedgwood is common in secondary-school and first-year university syllabi. It links to neighbouring topics 1942 births, 2020 deaths, Australian civil engineers, so understanding it makes those chapters shorter.
In everyday life
Look for Ray Wedgwood outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Ray Wedgwood” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Ray Wedgwood in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Ray Wedgwood means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Ray Wedgwood out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Ray Wedgwood in simple terms?

Raymond John Lloyd Wedgwood (27 May 1942 – 5 March 2020) was an Australian engineer who served as the Chief Bridge Engineer of the Department of Main Roads and the Roads & Traffic Authority in New South Wales. He designed and supervised the construction of many major bridges across New South Wales…

Why does Ray Wedgwood matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Ray Wedgwood?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Ray Wedgwood.

Tags

  • 1942 births
  • 2020 deaths
  • Australian civil engineers
  • Bridge design
  • People from Bellingen, New South Wales
  • Structural engineers
  • University of Sydney alumni

Keep exploring