Risk management plan

Risk management plan is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Risk management plan rather than just read about it. In short: A risk management plan is a document to foresee risks, estimate impacts, and define responses to risks. It also contains a risk assessment matrix.

Key takeaways

  • Risk management plan belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Risk management plan to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Risk management plan from memory before moving on to harder problems.

Reference excerpt

A risk management plan is a document to foresee risks, estimate impacts, and define responses to risks. It also contains a risk assessment matrix. According to the Project Management Institute, a risk management plan is a "component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed". Moreover, according to the Project Management Institute, a risk is "an uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives". Risk is inherent with any project, and project managers should assess risks continually and develop plans to address them. The risk management plan contains an analysis of likely risks with both high and low impact, as well as mitigation strategies to help the project avoid being derailed should common problems arise. Risk management plans should be periodically reviewed by the project team to avoid having the analysis become stale and not reflective of actual potential project risks.

Risk response

Broadly, there are four potential responses to risk with numerous variations on the specific terms used to name these response options:

Avoid – Change plans to circumvent the problem; Control / mitigate / modify / reduce – Reduce threat impact or likelihood (or both) through intermediate steps; Accept / retain – Assume the chance of the negative impact (or auto-insurance), eventually budget the cost (e.g. via a contingency budget line); or Transfer / share – Outsource risk (or a portion of the risk) to a third party or parties that can manage the outcome. This is done financially through insurance contracts or hedging transactions, or operationally through outsourcing an activity. (Mnemonic: SARA, for Share Avoid Reduce Accept, or A-CAT, for "Avoid, Control, Accept, or Transfer") Risk management plans often include matrices.

Examples The United States Department of Defense, as part of acquisition, uses risk management planning that may have a Risk Management Plan document for the specific project. The general intent of the RMP in this context is to define the scope of risks to be tracked and means of documenting reports. It is also desired that there would be an integrated relationship to other processes. An example of this would be explaining which developmental tests verify risks of the design type were minimized are stated as part of the test and evaluation master plan. A further example would be instructions from 5000.2D that for programs that are part of a system of systems the risk management strategy shall specifically address integration and interoperability as a risk area. The RMP specific process and templates shift over time (e.g. the disappearance of 2002 documents Defense Finance and Accounting Service / System Risk Management Plan, and the SPAWAR Risk Management Process).

See also Event chain methodology Project management Project Management Professional Risk Evaluation and Mitigation Strategies (REMS) Risk management Risk management tools Risk management framework Gordon–Loeb model for cyber security investments

Citations

References Project Management Institute (2021). A guide to the project management body of knowledge (PMBOK guide). Project Management Institute (7th ed.). Newtown Square, PA. ISBN 978-1-62825-664-2.{{cite book}}: CS1 maint: location missing publisher (link)

External links Creating The Risk Management Plan (template included) EPA RMP Rule page Risk Management Guide for DoD Acquisition (ver 6 - ver 5.2 more detailed but obsolete) Defense Acquisition University, System Engineering Fundamentals (see ch 15) US DoD extension to PMBOK Guide, June 2003 (see ch 11) Archived 2022-01-28 at the Wayback Machine US DoD extension to PMBOK Guide (see ch 11) US Defense Acquisition Guidebook (DAG) - ch8 testing DAU Risk Management Plan template

Worked examples

Example 1 — a first encounter with Risk management plan

Start with the simplest possible case. Write down what Risk management plan claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Risk management plan before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Risk management plan ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Risk management plan

In research
Risk management plan appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Risk management plan in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Risk management plan is common in secondary-school and first-year university syllabi. It links to neighbouring topics Project management, Risk management, Systems engineering, so understanding it makes those chapters shorter.
In everyday life
Look for Risk management plan outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Risk management plan” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Risk management plan in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Risk management plan means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Risk management plan out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Risk management plan in simple terms?

A risk management plan is a document to foresee risks, estimate impacts, and define responses to risks. It also contains a risk assessment matrix.

Why does Risk management plan matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Risk management plan?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Risk management plan.