The Rolls-Royce Pressurised Water Reactor (PWR) series has powered the Royal Navy's nuclear submarines since the Valiant class, commissioned in 1966. The series, through the PWR3+ reactor, will also power the upcoming SSN-AUKUS submarines for the Royal Navy and Royal Australian Navy.
Background Nuclear reactor designs, operating methods and performance standards are highly classified. The United Kingdom's first nuclear-powered submarine HMS Dreadnought, commissioned in 1963, was powered by an American Westinghouse S5W reactor, provided to Britain under the 1958 US-UK Mutual Defence Agreement.
PWR1
The first British naval reactor was the PWR1. It was based on a core and reactor assembly of purely British design. The reactor first went critical in 1965, four years later than planned. Technology transfers under the US-UK Mutual Defence Agreement eventually made Rolls-Royce entirely self-sufficient in reactor design in exchange for a "considerable amount" of information regarding submarine design and quietening techniques being passed on to the United States. The reactor fuel was highly enriched uranium (HEU) enriched to between 93% and 97%. Each nuclear core had a life of about 10 years, so had to be refueled about twice during the lifetime of a submarine. Rolls-Royce Marine Power Operations at Derby was the centre for design and manufacture of the UK's submarine reactors, and remains so today. The Ministry of Defence's Vulcan Naval Reactor Test Establishment (NRTE), at Dounreay, tested each reactor core design prior to its installation in nuclear submarines.
Submarines Prototype Vulcan Naval Reactor Test Establishment (NRTE), Dounreay Core A Valiant-class fleet submarine Valiant Warspite Resolution-class SSBN Resolution Repulse Renown Revenge Core B Churchill-class SSN Churchill Conqueror Courageous Core Z Swiftsure-class SSN Swiftsure Sovereign Superb Sceptre Spartan Splendid Trafalgar-class SSN Trafalgar Turbulent Tireless Torbay Trenchant Talent Triumph
PWR2 The PWR2 was developed for the Vanguard-class Trident missile submarines and is a development of the PWR1. The first PWR2 reactor was completed in 1985 with testing beginning in August 1987 at the Vulcan Naval Reactor Test Establishment. The reactor fuel is highly enriched uranium (HEU) enriched to between 93% and 97%. The latest PWR2 reactor core design is "Core H", which has a life of about 30 years removing the need for refueling, allowing a submarine to avoid two reactor refits in its service life. HMS Vanguard was fitted with the new core during its refit, followed by her three sister boats. The Astute-class submarines have this full-life core installed. As they were developed for SSBNs, the reactors are considerably larger than those of then-current British fleet submarines. The diameter of then-forthcoming Astute-class hulls was therefore increased to accommodate the PWR2. A safety assessment of the PWR2 design by the Defence Nuclear Safety Regulator in November 2009 was released under a Freedom of Information request in March 2011. The regulator identified two major areas where UK practice fell significantly short of comparable good practice: loss-of-coolant accident and control of submarine depth following emergency reactor shutdown. The regulator concluded that PWR2 was "potentially vulnerable to a structural failure of the primary circuit", which was a failure mode with significant safety hazards to crew and the public. In January 2012 radiation was detected in the PWR2 test reactor's coolant water, caused by a microscopic breach in fuel cladding. This discovery led to HMS Vanguard being refueled early and contingency measures being applied to other Vanguard and Astute-class submarines, at a cost of £270 million. This was not revealed to the public until 2014. In February 2013, the Ministry of Defence (MoD) awarded Rolls-Royce a £800 million ten year "foundation" contract to "deliver and maintain" the reactors of the Astute-class and the Vanguard-class replacement the Successor. In February 2019, the MoD awarded Rolls-Royce a £235 million three year contract for Nuclear Propulsion Lifetime Management for the Trafalgar, Vanguard and Astute classes.
Submarines Core H Vanguard-class ballistic missile submarine Vanguard Victorious Vigilant Vengeance Astute-class fleet submarine Astute Ambush Artful Audacious Anson Agamemnon Achilles (under construction)