ArticleslgStudy

engineering

Rough (facility)

Rough (facility) is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Rough (facility) rather than just read about it. In short: Rough is a natural gas storage facility under the North Sea off the east coast of England. It is capable of storing 100 billion cubic feet of gas, nearly double the storage capacities in operation in Great Britain in 2021.

Rough (facility) — main illustration
Rough (facility) — illustration

Key takeaways

  • Rough (facility) belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Rough (facility) to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Rough (facility) from memory before moving on to harder problems.

Reference excerpt

Rough is a natural gas storage facility under the North Sea off the east coast of England. It is capable of storing 100 billion cubic feet of gas, nearly double the storage capacities in operation in Great Britain in 2021. First opened in 1985, it was closed by Centrica Storage Ltd in 2017 because of the need for costly maintenance, the UK government declining to subsidise repairs. Centrica gained approval from safety inspectors for the facility to be brought back into service in August 2022, and it was partly reopened on 28 October 2022.

History Production licences for the Rough field were given in 1964, and gas was first brought ashore to Easington gas processing terminal in 1975. In 1980, British Gas Corporation (which became British Gas plc in 1986 following privatisation) purchased the Rough field with one-third of reserves depleted, with the intention of converting the field into a gas storage facility to manage seasonal trends in the supply and demand of gas in the UK. In 1983, British Gas Corporation made the final decision to convert Rough into a natural gas storage facility. It came into operation in 1985 as the largest gas storage facility built in the UK continental shelf, capable of storing 100 billion cubic feet of gas, nearly double Great Britain's 2021 capacity. The break-up of British Gas plc in 1997 into BG Group and Centrica meant that BG Storage was created as a ring-fenced subsidiary of BG Group, for competition reasons. In 2001, BG Group sold BG Storage, and thus the Rough facility, to Dynegy. In 2002, Centrica bought the plant from Dynegy for £304 million during Dynegy's period of near-bankruptcy. The purchase of Rough led to the Competition Commission requesting certain undertakings being put in place because of Centrica's control of the Morecambe Bay gas fields, which at the time were providing 10–15% of the UK's gas supply. In 2003, Centrica provided DECC with a set of undertakings and Centrica Storage Ltd (a wholly owned subsidiary of Centrica plc) was formed. Centrica Storage Ltd still operates the Rough facility in accordance with the undertakings.

Profitability The facility had made a profit for its owners by exploiting the difference in gas price between summer and winter. Gas was injected for storage when its future price on the commodities futures market rose sufficiently above its current market price. That gas would be sold with a future delivery date, creating an instant profit. It was then held in the facility until the date contracted with the purchaser on which it was required to be delivered. However, this business model became harder to operate as the global market in liquefied natural gas developed. This was one of the factors leading to Rough's closure in 2017. Centrica have both claimed that Rough is loss making and highly profitable. In their 2024 Annual report they claimed that "The Rough gas storage facility was re-opened, at a cost of less than £10m, generating £653m operating profit between 2022 and 2024". However they have also briefed the media that "losses are unsustainable unless the Government agrees to a price-smoothing mechanism."

Closure and partial reopening In June 2017, Centrica announced the closure of the Rough gas storage site on the grounds that it was uneconomical and had reached the end of its design life. In May 2022, the Secretary of State for Business, Energy and Industrial Strategy, Kwasi Kwarteng, began talks with the site's owners with a view to reopening the site to help ease the ongoing cost-of-living crisis in the United Kingdom. In June 2022, owners Centrica submitted an application to the North Sea Transition Authority (NSTA), the licensing authority for the UK Government, to reopen the facility. Approval was granted in July. Subsequently, Centrica indicated that they are working to restore storage operations at Rough which would depend on securing subsidies from the British government. Centrica was aiming to have some capacity available for the winter of 2022/23 against an overall plan to increase storage capacity gradually over time. On 28 October 2022, Centrica stated that 20% of the capacity of the Rough facility was available for storage, thereby increasing the total storage in the UK by about 50%. Centrica intends to eventually convert Rough into a facility for storing hydrogen.

Operation

… excerpt ends here. Continue reading the full article.

Illustrations

Rough (facility): Easington gas terminal in 2007. From here the gas flow in and out of the Rough field is managed
Easington gas terminal in 2007. From here the gas flow in and out of the Rough field is managed

Worked examples

Example 1 — a first encounter with Rough (facility)

Start with the simplest possible case. Write down what Rough (facility) claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Rough (facility) before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Rough (facility) ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Rough (facility)

In research
Rough (facility) appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Rough (facility) in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Rough (facility) is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures in the East Riding of Yorkshire, Centrica, Natural gas infrastructure in the United Kingdom, so understanding it makes those chapters shorter.
In everyday life
Look for Rough (facility) outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Rough (facility)” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Rough (facility) in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Rough (facility) means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Rough (facility) out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Rough (facility) in simple terms?

Rough is a natural gas storage facility under the North Sea off the east coast of England. It is capable of storing 100 billion cubic feet of gas, nearly double the storage capacities in operation in Great Britain in 2021.

Why does Rough (facility) matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Rough (facility)?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Rough (facility).

Tags

  • Buildings and structures in the East Riding of Yorkshire
  • Centrica
  • Natural gas infrastructure in the United Kingdom
  • Natural gas storage

Keep exploring