ArticleslgStudy

physics

SEFOR

SEFOR is a physics topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand SEFOR rather than just read about it. In short: SEFOR (Southwest Experimental Fast Oxide Reactor) was an experimental fast breeder reactor located in Cove Creek Township, Washington County, near Strickler, in northwest Arkansas (20 miles southwest of Fayetteville, Arkansas). The site consisted of a 20-Megawatt (thermal), Sodium-Cooled Test Reactor, a Shop Building, an Operations Building, a Maintenance Shed, and an Electrical Transformer yard.

SEFOR — main illustration
SEFOR — illustration

Key takeaways

  • SEFOR belongs to physics; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect SEFOR to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of SEFOR from memory before moving on to harder problems.

Reference excerpt

SEFOR (Southwest Experimental Fast Oxide Reactor) was an experimental fast breeder reactor located in Cove Creek Township, Washington County, near Strickler, in northwest Arkansas (20 miles southwest of Fayetteville, Arkansas). The site consisted of a 20-Megawatt (thermal), Sodium-Cooled Test Reactor, a Shop Building, an Operations Building, a Maintenance Shed, and an Electrical Transformer yard. It operated from 1969 to 1972 when the program ended. It was then acquired by the University of Arkansas, in hopes that it could be used as a research facility in 1975, but it never happened. The University maintained the decommissioned site until finally receiving federal funds to dismantle the facility in 2016, which completed in 2019.

It used MOX fuel and liquid sodium cooling, and generated 20MW of heat but no electricity. It was constructed particularly to test the suggested inherent safety features of the oxide fuel/sodium cooling configuration, and in particular the effect on the core of thermal expansion, including in an accident situation. The belief that this would stabilize the core was confirmed. The design concept of using thermal expansion to stabilize a reactor core has since been featured in other reactor designs, notably in the pebble bed reactor, which is however neither a fast neutron reactor nor a breeder reactor, and in subsequent Fast breeder reactors. SEFOR operated from 1969 to 1972, when the original program was completed as planned. It was privately operated by General Electric and funded by the United States government through the Southwest Atomic Energy Associates, a nonprofit consortium formed by 17 power companies of the Southwest Power Pool and European nuclear agencies. A proposal for funding to extend its operation to 1977 was rejected prior to the closure in 1972. The fuel and irradiated sodium coolant were removed and taken offsite later in 1972, and the facility was placed in safe storage. The reactor was acquired by the University of Arkansas in 1975, and was used to calibrate equipment and as a research tool for graduate students. SEFOR was designated a Nuclear Historic Landmark site in October 1986, and that same year the university stopped using the facility but continued to maintain surveillance through maintenance activities and periodic visits to the reactor. A caretaker also lived on site in the former Visitors’ Center.

Dismantlement By the early 2000s the site was considered contaminated and the university began seeking $16 million in funding for decontamination work. Arkansas Senator Blanche Lincoln had been trying to secure funds to clean up the site since 1999. In 2005 she introduced legislation to decommission and decontaminate SEFOR in the Energy Policy Act of 2005. Although the bill was approved and signed by President George W. Bush, money for cleaning up the site was not appropriated. In 2008 Senator Lincoln managed to get $2 million to start the dismantlement process added to an appropriations bill. In 2009, it was announced that the University of Arkansas would get the $1.9 million from the U.S. Department of Energy for a "characterization study" to determine what would be required for cleaning up the site. On November 16, eight professionals from EnergySolutions, an international nuclear services company based in Salt Lake City and one of four companies who bid on the project, visited the SEFOR facility as the first stages of planning for a complete cleanup. The plan was supposed to be completed by January 2010. At that point the University would be able to apply for the estimated $20 million from the federal government for a complete clean up. SEFOR appeared on the Fiscal Year 2010 Energy and Water Development Appropriations Requests on Senator Mark Pryor's website. The project was described as a "demonstration project to test expedited procedures for a reactor site cleanup". In September 2016 the University of Arkansas finally received a $10.5 million grant from the Department of Energy to decommission and dismantle the SEFOR site. On January 19, 2017 the University of Arkansas conducted public tours of the site ahead of large scale dismantling. The 84,000 pound radioactive core was removed by crane and placed in a carbon steel containment vessel October 16, 2018. The vessel was then welded shut and shipped out of state. The whole procedure took about 18 minutes. On April 18, Energy Solutions announced the cleanup project was completed at a community meeting at the Strickler Fire Department Community Center, and was awaiting a final report from the Arkansas Department of Environmental Quality, the Arkansas Department of Health and the U.S. Department of Energy to give an official ‘No Further Action is Required’ for the site.

Notes ^"Atomic Pork", Susan Porter and Frieda Thomas, Fayetteville Free Weekly, Dec 8-14, 2005.

References

External links News report about the dismantling and public tours Youtube Vekshin, Alison (January 26, 2005). "Lincoln revives SEFOR clean-up bill". Arkansas News Bureau. Branam, Chris (July 30, 2005). "Energy bill OKs plan to clean up UA reactor site". NWAnews.com. American Nuclear Society: Nuclear Historic Landmark Award recipients. Taylor Wilson. Please enjoy this entertaining photo essay below from that original SEFOR visit on June 1, 2006. [1] Document from DOE archive (1MB PDF) — specifically the Introduction and Appendix A.1 http://www.nwaonline.net/articles/2008/07/16/news/071708dcseformoney.txt http://lincoln.senate.gov/releases/02/07/2002725845.html Archived 2004-07-24 at the Wayback Machine http://www2.arkansasonline.com/news/2009/jul/22/ua-get-19-million-start-cleanup-sefor/ http://www.emcbc.doe.gov/files/news/NR%20SEFOR%20Jul2109.pdf http://www.emcbc.doe.gov/sefor/ http://dailyheadlines.uark.edu/16219.htm Archived 2010-06-10 at the Wayback Machine http://www.einnews.com/pr_news/346773101/doe-awards-southwest-experimental-fast-oxide-reactor-sefor-grant http://5newsonline.com/2016/10/10/deactivated-nuclear-reactor-site-to-be-cleaned-up/ http://news.uark.edu/articles/35800/-10-5-million-grant-from-doe-to-fund-clean-up-of-former-nuclear-reactor-site http://5newsonline.com/2017/01/19/hundreds-tour-nuclear-reactor-in-strickler-prior-to-dismantle/ http://5newsonline.com/2017/01/19/slideshow-tour-of-sefor-nuclear-reactor-ahead-of-dismantling/ https://www.fox16.com/news/state-news/sefor-nuclear-reactor-removed-in-nwa/1529594478

Illustrations

SEFOR: Vintage photograph of SEFOR (Southwest Experimental Fast Oxide Reactor), 1971
Vintage photograph of SEFOR (Southwest Experimental Fast Oxide Reactor), 1971

Worked examples

Example 1 — a first encounter with SEFOR

Start with the simplest possible case. Write down what SEFOR claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In physics, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to SEFOR before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about SEFOR ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of SEFOR

In research
SEFOR appears in physics research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses SEFOR in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
SEFOR is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures in Washington County, Arkansas, Defunct nuclear reactors, Former nuclear research institutes, so understanding it makes those chapters shorter.
In everyday life
Look for SEFOR outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study SEFOR in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what SEFOR means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain SEFOR out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is SEFOR in simple terms?

SEFOR (Southwest Experimental Fast Oxide Reactor) was an experimental fast breeder reactor located in Cove Creek Township, Washington County, near Strickler, in northwest Arkansas (20 miles southwest of Fayetteville, Arkansas). The site consisted of a 20-Megawatt (thermal), Sodium-Cooled Test React…

Why does SEFOR matter?

Because it connects several physics ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study SEFOR?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on SEFOR.

Tags

  • Buildings and structures in Washington County, Arkansas
  • Defunct nuclear reactors
  • Former nuclear research institutes
  • History of Arkansas

Keep exploring