ArticleslgStudy

engineering

Sabah Oil and Gas Terminal

Sabah Oil and Gas Terminal is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Sabah Oil and Gas Terminal rather than just read about it. In short: Sabah Oil and Gas Terminal (SOGT) is a terminal located in Kimanis, Papar District, Sabah, Malaysia. The terminal handles the production of oil and gas from the West Coast Field in South China Sea facing the western coast of Sabah, which covering the operations of Sabah Gas Terminal, Labuan Crude Oil Terminal and the Labuan Gas Terminal.

Sabah Oil and Gas Terminal — main illustration
Sabah Oil and Gas Terminal — illustration

Key takeaways

  • Sabah Oil and Gas Terminal belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Sabah Oil and Gas Terminal to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Sabah Oil and Gas Terminal from memory before moving on to harder problems.

Reference excerpt

Sabah Oil and Gas Terminal (SOGT) is a terminal located in Kimanis, Papar District, Sabah, Malaysia. The terminal handles the production of oil and gas from the West Coast Field in South China Sea facing the western coast of Sabah, which covering the operations of Sabah Gas Terminal, Labuan Crude Oil Terminal and the Labuan Gas Terminal. Covering an area of about 250 acres, with a capacity to handle up to 300,000 barrels of crude oil per day and 1.0 billion standard cubic feet of gas per day. The terminal stores oil before it is transported by tanker. The terminal is also connected to another terminal in neighbouring Sarawak through the Sabah–Sarawak Gas Pipeline.

History

The proposal to build the terminal has been put forward since 2005. The ground-breaking was officiated by Prime Minister Abdullah Ahmad Badawi in 2007. In 2010, South Korean-company Samsung Engineering signed a $770 million contract with Petronas to jointly develop the project. A Sarawak-based Malaysian construction company, Naim Holdings Berhad also entered the joint venture with the project was finally complete in 2014.

References

External links Media related to SOGT Kimanis at Wikimedia Commons Sabah Oil and Gas Terminal

Illustrations

Sabah Oil and Gas Terminal illustration
Sabah Oil and Gas Terminal: Oil refinery fire tower at the terminal.
Oil refinery fire tower at the terminal.

Worked examples

Example 1 — a first encounter with Sabah Oil and Gas Terminal

Start with the simplest possible case. Write down what Sabah Oil and Gas Terminal claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Sabah Oil and Gas Terminal before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Sabah Oil and Gas Terminal ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Sabah Oil and Gas Terminal

In research
Sabah Oil and Gas Terminal appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Sabah Oil and Gas Terminal in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Sabah Oil and Gas Terminal is common in secondary-school and first-year university syllabi. It links to neighbouring topics 2014 establishments in Malaysia, Buildings and structures completed in 2014, Buildings and structures in Sabah, so understanding it makes those chapters shorter.
In everyday life
Look for Sabah Oil and Gas Terminal outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Sabah Oil and Gas Terminal” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Sabah Oil and Gas Terminal in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Sabah Oil and Gas Terminal means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Sabah Oil and Gas Terminal out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Sabah Oil and Gas Terminal in simple terms?

Sabah Oil and Gas Terminal (SOGT) is a terminal located in Kimanis, Papar District, Sabah, Malaysia. The terminal handles the production of oil and gas from the West Coast Field in South China Sea facing the western coast of Sabah, which covering the operations of Sabah Gas Terminal, Labuan Crude O…

Why does Sabah Oil and Gas Terminal matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Sabah Oil and Gas Terminal?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Sabah Oil and Gas Terminal.

Tags

  • 2014 establishments in Malaysia
  • Buildings and structures completed in 2014
  • Buildings and structures in Sabah
  • Natural gas plants
  • Natural gas terminals
  • Oil terminals
  • Papar District

Keep exploring