ArticleslgStudy

science

Shift plan

Shift plan is a science topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Shift plan rather than just read about it. In short: The shift plan, rota or roster (esp. British) is the central component of a shift schedule in shift work.

Key takeaways

  • Shift plan belongs to science; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Shift plan to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Shift plan from memory before moving on to harder problems.

Reference excerpt

The shift plan, rota or roster (esp. British) is the central component of a shift schedule in shift work. The schedule includes considerations of shift overlap, shift change times and alignment with the clock, vacation, training, shift differentials, holidays, etc. The shift plan determines the sequence of work (W) and free (F) days within a shift system.

Notation A notation used often identifies day (D), swing (S) and night (N) shifts for the W days and O (off) for rest days.

W work days D day shift, 1st shift, early shift This shift often occurs from either 06:00 or 07:00 to either 14:00 or 15:00 for eight-hour shifts, and from 06:00 to 18:00 for twelve-hour shifts. S swing shift, 2nd shift, late shift, back shift, afternoon shift This shift often occurs from either 14:00 or 15:00 to either 22:00 or 23:00 for eight-hour shifts, and is not used with twelve-hour shifts. N night shift, 3rd shift, graveyard shift This shift often occurs from either 22:00 or 23:00 to either 06:00 or 07:00 for eight-hour shifts, and from 18:00 to 06:00 for twelve-hour shifts. F free days O days off This is defined as a day on which a shift does not begin. A~F work teams (starts from A as first team) Note that a worker transitioning from N to O works for the first six or seven hours of the first day "off". Thus, when days off follow night shifts, the first one or more days "off" are, in fact, days of recovery from lack of nighttime sleep. This daily notation refers to the start of a shift. If a shift starts at 23:00, then this is a W day even though only one hour is worked. The day after this shift is an F day if no shift starts on this day, though many hours have been worked from midnight on. One shift system may allow many shift plans. For example, the twelve-hour, 2nW:2nF system with n = 1 allows twelve different plans in three serially-identical sets. Within a set, DONO has the same sequence as NODO. DNOO is the preferred sequence because days off follow night work and there are two consecutive days off.

3-day shift plans

Prior to 2014, the U.S. Navy used a three shift system with an 18-hour day instead of a 24-hour day. The 24-hour period was divided into four shifts: 00:00-06:00, 06:00-12:00, 12:00-18:00, and 18:00-00:00. A sailor stood watch on their shift. During the off shift there is time to perform maintenance, study for qualifications, and handle collateral duties. During off time the sailor has time to sleep, relax, and perform personal tasks, such as laundry. With sufficient personnel, a given watchstation may benefit from a fourth man (the midnight cowboy or "Balls-to-6"). He would stand the same 6-hour watch in a given 24-hour period, usually from midnight to 06:00 (hence the midnight portion of the name, often shortened to cowboy) and the normal watchstander would then be free. This gave rise to a schedule of six on, twelve off, six on, thirty off, six on, twelve off. Beginning in 2014, the Submarine Force began shifting to a 24-hour day, with watches split into 8 hours on, 16 hours off. This does have the side effect of sailors assigned to a certain shift having the same meals every day, and so the shifts are periodically rotated in order to provide variety. The Surface Fleet began its shift in 2017, transitioning from their "five and dimes" approach of 5 hours on, 10 hours off. This does not apply to the attached air wing, which will work a 12 on, 12 off schedule 7 days a week.

4-day shift plans

In the 12/24/12/48 or 12/24 plan, employees work in shifts of 12 hours; first a "daily shift" (e.g. 07:00 to 18:00), followed by 24 hours' rest, This plan needs four teams for full coverage, and makes an average 42-hour workweek. The pattern repeats in a 4-week cycle, i.e. over 28 days, and has 14 shifts per employee therein.

5-day shift plans

In four on, one off the employee only gets one day off after a work streak of four days. There are 28 shifts per employee in a five-week cycle (i.e. 35 days). This adds up to an average of 42 hours worked per week with 7½-hour shifts. This plan is mainly adopted by industries in which companies prefers to work for all days of the week, often with four (overlapping) shifts per day, and where laws do not let employees work for 12 hours a day for several days. Five groups of employees are needed to cover a specific shift on all days, where each group gets a different day off.

6-day shift plans

In four on, two off the employee gets two days off. There are 28 shifts per employee in a six-week cycle (i.e. 42 days), this adds up to an average of 56 hours worked per week with 12-hour shifts, or 37+1⁄3 hours per week with 8-hour shifts. Three groups are needed for each time span, i.e. to cover the whole day and week a company needs 6 groups for 12-hour shifts or 9 groups for 8-hour shifts. This plan is mainly adopted by industries in which employees do not engage in much physical activity.

Week shift plans

Three-shifts The three-shift system is the most common plan for five 24-hour days per week. The "first shift" often runs from 06:00 to 14:00, "second shift" or "swing shift" from 14:00 to 22:00 and a "third shift" or "night shift" from 22:00 to 06:00, but shifts may also have different length to accommodate for workload, e.g. 7, 8 and 9 or 6, 8 and 10 hours. To provide coverage 24/7, employees have their days off ("weekends") on different days. All of the shifts have desirable and less desirable qualities. First shift has very early starts, so time in the evening before is heavily cut short. The second shift occupies the times during which many people finish work and socialize. The third shift creates a situation in which the employee must sleep during the day; it may be preferred for night owls, for whom this is a desired sleep pattern.

… excerpt ends here. Continue reading the full article.

Worked examples

Example 1 — a first encounter with Shift plan

Start with the simplest possible case. Write down what Shift plan claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In science, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Shift plan before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Shift plan ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Shift plan

In research
Shift plan appears in science research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Shift plan in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Shift plan is common in secondary-school and first-year university syllabi. It links to neighbouring topics Circadian rhythm, Labor rights, Working time, so understanding it makes those chapters shorter.
In everyday life
Look for Shift plan outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Shift plan in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Shift plan means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Shift plan out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Shift plan in simple terms?

The shift plan, rota or roster (esp. British) is the central component of a shift schedule in shift work.

Why does Shift plan matter?

Because it connects several science ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Shift plan?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Shift plan.

Tags

  • Circadian rhythm
  • Labor rights
  • Working time

Keep exploring