ArticleslgStudy

engineering

Skelton Dam

Skelton Dam is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Skelton Dam rather than just read about it. In short: The Skelton Dam is an embankment dam on the Saco River between the towns of Buxton and Dayton in York County, Maine. It is located about 7 mi (11 km) northwest of Saco and Biddeford.

Skelton Dam — main illustration
Skelton Dam — illustration

Key takeaways

  • Skelton Dam belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Skelton Dam to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Skelton Dam from memory before moving on to harder problems.

Reference excerpt

The Skelton Dam is an embankment dam on the Saco River between the towns of Buxton and Dayton in York County, Maine. It is located about 7 mi (11 km) northwest of Saco and Biddeford. The dam was completed in 1948 with the primary purpose of hydroelectric power generation. The largest fish lift in Maine was completed on the dam in 2001. The dam and facilities are owned by Brookfield Renewable.

References

Illustrations

Skelton Dam illustration

Worked examples

Example 1 — a first encounter with Skelton Dam

Start with the simplest possible case. Write down what Skelton Dam claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Skelton Dam before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Skelton Dam ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Skelton Dam

In research
Skelton Dam appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Skelton Dam in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Skelton Dam is common in secondary-school and first-year university syllabi. It links to neighbouring topics Buildings and structures in York County, Maine, Buxton, Maine, Dams completed in 1948, so understanding it makes those chapters shorter.
In everyday life
Look for Skelton Dam outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Skelton Dam” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Skelton Dam in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Skelton Dam means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Skelton Dam out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Skelton Dam in simple terms?

The Skelton Dam is an embankment dam on the Saco River between the towns of Buxton and Dayton in York County, Maine. It is located about 7 mi (11 km) northwest of Saco and Biddeford.

Why does Skelton Dam matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Skelton Dam?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Skelton Dam.

Tags

  • Buildings and structures in York County, Maine
  • Buxton, Maine
  • Dams completed in 1948
  • Dams in Maine
  • Dams with fish ladders
  • Energy infrastructure completed in 1948
  • Hydroelectric power plants in Maine
  • Saco River
  • United States power company dams

Keep exploring