A small modular reactor (SMR) is an emergent class of nuclear fission reactors with a rated electrical power of less than 300 megawatts (MWe), which use modular design principles to achieve streamlined construction and enhanced scalability compared to large light-water reactors. Many SMR designs are intended to be built in factories and transported to installation sites as prefabricated modules, while others are designed for flexible multi-unit configurations. The term SMR refers to the physical size, electrical capacity, and modular construction approach. Reactor technology varies significantly among SMR designs. As of March 2026, most SMR designs are light-water reactors (LWRs), however SMR concepts encompass various reactor types, including generation IV, thermal-neutron reactors, fast-neutron reactors, molten salt reactor, and gas-cooled reactor models. Many SMRs also incorporate passive safety features. Commercial SMRs are designed to deliver an electrical power output as low as 10 MWe and up to 300 MWe per module. Reactors below 10 MWe in capacity are considered nuclear microreactors. SMRs may also be designed purely for desalination or process heat rather than electricity. These SMRs are measured in megawatts thermal (MWt). Many SMR designs plan for customers to simply add modules to achieve a desired electrical output rather than scaling the size of the reactor. These reactors are also expected to enhance safety through passive safety systems that operate without external power or human intervention during emergency scenarios, although this is not specific to SMRs but rather a characteristic of most modern reactor designs. SMRs are also claimed to have lower power plant staffing costs, as their operation is fairly simple, and are claimed to have the ability to bypass financial and safety barriers that inhibit the construction of conventional reactors. SMRs have attracted strong interest from technology companies, such as Google and Microsoft, for use in powering data centers to meet demand driven by the AI boom. Modular reactors are expected to reduce construction costs and time compared to large light-water reactors, as well as allow data center operators to draw power exclusively from a behind-the-meter SMR without purchasing electricity from the power grid.

Definition According to the American Nuclear Society (ANS), while small or modular reactor concepts date back to the 1950s, the term "small modular reactor" first entered common use in the late 1970s. Since then, the definition of an SMR has remained somewhat controversial. John Fabian, writing in Nuclear Newswire, stated in 2026 that until around 2011, the abbreviation "SMR" referred either to "small modular reactor" or "small and medium sized reactor". According to Fabian, "the way 'SMR' is being used today does not seem consistent and is design dependent." For example, as of 2026 the United States Nuclear Regulatory Commission (NRC) defines SMRs as only light-water reactors under 300 MWe, while non-LWR designs are considered "advanced reactors". At the same time, the World Nuclear Association defines SMRs as any reactor under 300 MWe so long as it is designed with modular technology. According to Fabian, the classification of reactors as SMRs based on their power output has remained consistent, with reactors under 300 MWe being classified as SMRs. As of 2023, there was broad consensus in the nuclear industry that SMRs are defined as nuclear reactors designed intentionally for low power (below 300 MWe) and with modular design applied either to individual components or the entire assembly.

Operational SMRs As of 2026, only China and Russia have successfully built operational SMRs. Russia has been operating a floating nuclear power plant Akademik Lomonosov, in Russia's Far East (Pevek), commercially since 2020. China's pebble-bed modular high-temperature gas-cooled reactor HTR-PM was connected to the grid in 2021. As of 2025, there were 127 modular reactor designs, with seven designs operating or under construction, 51 in the pre-licensing or licensing process, and 85 designers in discussions with potential site owners.

Background While small modular reactors have experienced a resurgence in the 2000s, they are not a novel concept, and have been under development for many decades.

Early small reactors Small reactors have been used for military use since the 1950s for nuclear marine propulsion. The thermal output of the largest naval reactor as of 2025 is estimated at 700 MWt (the A1B reactor), similar in capacity to some large SMR plant designs. Naval nuclear reactors have had an excellent record of safety. According to public information, the US Navy's Naval Reactors program has never succumbed to a meltdown or radioactive release over its 60 years of service. In 2003, Admiral Frank Bowman backed up the Navy's claim by testifying no such accident has ever occurred. Several nuclear-powered commercial vessels have also been constructed, including four nuclear freighters and nine nuclear icebreakers. Lawrence R. Hafstad, the Director of Reactor Development at the United States Atomic Energy Commission, proposed building small, cheap, transportable nuclear power packages for use in remote areas. Alvin M. Weinberg, Director of Research at Oak Ridge National Laboratory (ORNL), wrote in support of Hafstad's proposal in 1952, adding that the naval reactors could provide a basis for developing nuclear power packages. He suggested that building many small reactors for remote sites would reduce the financial risk of establishing a nuclear industry:

The main advantage of the power-package approach to establishment of a nuclear energy industry is that the technology would rely on comparatively many small units, rather than on a very few enormous ones. Thus industry would not try to hit the jackpot right off, but would edge into the business a little at a time and at each stage would be able to match its risk with its financial capability.

Between 1954 and 1977, the US Army experimented with powering military installations with small land-based reactors during the Army Nuclear Power Program. The preliminary design for one such reactor was produced by ORNL under Weinberg's supervision. One of the Army reactors, PM-2A, was noted as extensively utilizing prefabricated modules to achieve lower construction cost. Military small reactors are quite different from commercial SMRs. Historically, the military relied on highly enriched uranium (HEU) to power their reactors and not the low-enriched uranium (LEU) fuel used by SMRs. This is because submarine reactors are severely space-constrained and require higher power density than civilian reactors. Many naval reactors also operate for over a decade or more without refueling. Early land-based reactors constructed in the United States were relatively small, such as the 60 MW Shippingport Atomic Power Station and the 250 MW Indian Point Unit 1. However, these reactors were intended to be scaled up into large central-station power plants, to take advantage of economies of scale. Soon after the first successful nuclear demonstrations, utilities raced to scale up plants before operational experience could be gained from smaller units. While traditional engineering wisdom dictates that a system should be scaled up twofold, by the time many nuclear plants with capacities exceeding 1000 MW were being ordered and constructed, no reactor larger than 250 MW was operational. While nuclear power plants were formerly designed as effectively standardized designs, the growth of operational issues and new safety requirements led to plants being designed and built as "one-of-a-kind" designs, further increasing cost, construction, and licensing issues. Reactor orders soon fell off sharply, and none of the plants ordered after 1974, except Watts Bar Unit 2, were ever constructed. The nuclear industry, throughout the following decades, would focus on optimizing the existing large reactors, whose average capacity factors rose from 50% to 90% by the mid-2000s.

Renewed interest In 1982, the Electric Power Research Institute (EPRI) conducted a study that recommended smaller, less capital-intensive, and inherently safe reactors be designed instead of large light-water reactors. Weinberg, then the director of the Institute for Energy Analysis, conducted a related study into inherently safe reactors. It concluded that such a system was possible, and selected the 400 MW Swedish Process Inherent Ultimate Safety (PIUS) and 100 MW American Modular High Temperature Gas-cooled Reactor (MHTGR) designs as the most intrinsically safe. At this time, multiple high-temperature gas-cooled reactors were being designed with the intention of building a large plant out of several modular low-power reactors. The PIUS reactor, with its reactor vessel situated within a large pool of borated water, and the robust TRISO fuel of the General Atomics MHTGR influenced subsequent SMR design features. Several small prefabricated reactor designs were developed around the same time in the UK, France, and Germany, however none were constructed. The EPRI study also led to the Department of Energy's (DOE) Advanced Light Water Reactor program, which resulted in the development of two 600 MW LWRs, the General Electric ABWR and later SBWR, and the Westinghouse AP-600 designs. However, these were later scaled up significantly into the ESBWR and AP-1000 reactors. Two AP-1000 reactors were later constructed as Vogtle Units 3 and 4, together costing $30 billion due to delays and cost overruns. The DOE also ran an Advanced Liquid-Metal Reactor program, which led to the development of the Power Reactor Inherently Safe Module (PRISM) SMR by General Electric in the 1980s and 1990s. Each 1400 MW PRISM plant would be composed of nine 160 MW reactor modules, which would each be factory-fabricated and shipped by rail to the construction site. PRISM's use of multiple factory-fabricated modules to comprise a large power plant and its extensive use of passive safety features were both carried into later SMR designs. In 1983, the International Atomic Energy Agency started the Small and Medium Power Reactor Project Initiation Study to survey designs for small and medium sized reactors. The Nuclear Energy Agency launched a follow-on study in 1991 that evaluated 17 small or medium-sized reactor concepts, including several from the DOE's Advanced Light Water and Liquid-Metal programs. Government support for reactor design steadily declined, leading to the DOE being issued no budget for nuclear development at all in 1998. However, in 1999 the DOE began the Nuclear Energy Research Initiative (NERI), followed by the Generation IV International Forum in 2000, and later the Global Nuclear Energy Partnership (GNEP) in 2006. The NERI program resulted in the development of multiple SMR designs, including liquid metal-cooled reactors and SMRs designed for process heat, as well as others based on existing LWR technology. In 2001, a report to Congress examining 50 MWe small modular reactors for powering remote areas, "found no substantive technical issues to hinder development and deployment of SMRs, and initial estimates of the electricity generation costs are comparable to, if not better than, those for current electricity supplies in typical remote areas." One concept, the IRIS SMR, would later receive significant commercial interest and funding under the GNEP, while another, the MASLWR, later formed the basis for NuScale's SMR. The GNEP and its associated programs also catalyzed significantly greater industry and utility interest in developing SMRs. The term "small modular reactors" as opposed to "small-and-medium-sized reactors" was brought to wider use when US Secretary of Energy Steven Chu identified "small modular reactors" as "America's new nuclear option" in a 2010 Wall Street Journal op-ed, where he stated "SMRs would be ready to 'plug and play' upon arrival [on site]" and be more affordable. He announced that President Barack Obama had requested $39 million for a new SMR design and licensing program. However, the reactors that were ordered at the time as part of the expected nuclear renaissance were all large light-water plants. Almost all of these projects failed, largely due to slow federal funding, little growth in electricity consumption, and the 2008 financial crisis, the effects of which were exacerbated by the high cost and financial risk of the plants. The Fukushima accident in 2011, while resulting in a significant loss of interest in nuclear energy, drew increased attention to SMRs. In 2012, the DOE began its SMR program in earnest, by which point interest in SMRs was significant.

Hope of enhanced safety and reduced costs Economic factors of scale mean that nuclear reactors tend to be large, to such an extent that size itself becomes a limiting factor. Furthermore, the 1986 Chernobyl disaster caused a major setback for the nuclear industry, with worldwide suspension of development, cuts in funding, and closure of reactor plants. Proponents claim that SMRs would be less expensive due to the application of standardized modules that could be industrially produced off-site in a dedicated factory. SMRs do, however, also have economic disadvantages. Several studies suggest that the overall costs of SMRs are comparable with those of conventional large reactors. Moreover, extremely limited information about SMR modules transportation has been published. Critics say that modular building will only be cost-effective for a high number of the same SMR type, given the still remaining high costs for each SMR. A high market share is thus needed to obtain sufficient orders.

Contribution to the net zero emissions pathways In February 2024, the European Commission recognized SMR technology as an important contributor to decarbonization as part of the EU Green Deal. In its pathway to reach global net zero emissions by 2050, the International Energy Agency (IEA) considers that worldwide nuclear power should be doubled between 2020 and 2050. Antonio Vaya Soler, an expert from the Nuclear Energy Agency (NEA), agrees that although renewable energy is essential to fight global warming, it will not be sufficient to achieve net zero CO2 emissions and nuclear energy capacity should be at least doubled. To produce the same electrical power as the ~ 400 large nuclear power reactors in the world today, BASE, the German Federal Office for the Safety of Nuclear Waste Management, warns that it would be necessary to build several thousand to tens of thousands of SMRs. Several fleets of SMRs of exactly the same type, industrially manufactured in large numbers, should be rapidly deployed worldwide to significantly reduce emissions of CO2. The Nuclear Energy Agency (NEA) launched at COP 28 an initiative Accelerating SMRs for Net Zero to foster collaboration between research organizations, nuclear industry, safety authorities, and governments, in order to reduce carbon emissions to net zero before 2050 to limit global surface temperature increase.

Future challenges Proponents say that nuclear energy with proven technology can be safer; the nuclear industry contends that smaller size will make SMRs even safer than larger conventional plants. This is because the main problem associated with nuclear meltdowns is the decay heat that is present after reactor shutdown, which would be much lower for SMRs because of their lower power output. Critics say that many more small nuclear reactors pose a higher risk, requiring more transportation of nuclear fuel and also increasing the production of radioactive waste. SMRs require new designs with new technology, the safety of which has yet to be proven. SMRs remain facing a distinct engineering risk of corrosion affecting critical systems and materials. Particularly in SMR systems that use liquid metals or molten salts cooling techniques. Lack of a licensing process and safety framework has left limited SMRs in preventing potential corrosion levels produced in alternative SMR designs. Until 2020, no truly modular SMRs had been commissioned for commercial use. In May 2020, the first prototype of a floating nuclear power plant with two 30 MWe reactors – the type KLT-40 – started operation in Pevek, Russia. This concept is based on the design of nuclear icebreakers. The operation of the first commercial land-based, 125 MWe demonstration reactor ACP100 (Linglong One) is due to start in China by the end of 2026. The introduction of SMRs has sparked social and institutional concern. Nuclear projects are of policy agendas, meaning centralization of SMRs. The distribution of SMRs has culminated in criticism and discussion of risk towards communities affected by lack of flexible energy. As any other energy source, communities are left out and potential environmental issues are needed to be assessed given the rate of expansion of SMR. In 2026, Natixis Corporate and Investment Banking reported that the SMR sector was still far from commercial reality and was entering a phase where engineering ambition must confront regulatory complexity, financing realities and industrial execution.

Designs

SMRs are envisioned in multiple designs. Some are simplified versions of current reactors, others involve entirely new technologies. All proposed SMRs use nuclear fission with designs including thermal-neutron reactors and fast-neutron reactors.

Thermal-neutron reactors Thermal-neutron reactors rely on a moderator (water, graphite, beryllium...) to slow neutrons and generally use 235U as fissile material. Most conventional operating reactors are of this type.

Fast reactors Fast reactors do not use moderators. Instead, they rely on highly enriched uranium (HEU) fuel to absorb fast neutrons. This usually means changing the fuel arrangement within the core, or using different fuels. E.g., 239Pu is more likely to absorb a fast neutron than 235U. Fast reactors can also be breeder reactors. These reactors release enough neutrons to transmute non-fissionable elements into fissionable ones. A common use for a breeder reactor is to surround the core by a "blanket" of 238U, the most easily available isotope. Once the 238U undergoes a neutron absorption reaction, it becomes 239Pu, which can be removed from the reactor during refueling, and subsequently reprocessed and used as fuel.

Technologies

Coolant Conventional light-water reactors typically use water as a coolant and neutron moderator. SMRs may use water, liquid metal, gas and molten salt as coolants. Coolant type is determined based on the reactor type, reactor design, and the chosen application. Large-rated reactors primarily use light water as coolant, allowing for this cooling method to be easily applied to SMRs. Helium is often elected as a gas coolant for SMRs because it yields a high plant thermal efficiency and supplies a sufficient amount of reactor heat. Sodium, lead, and lead-bismuth eutectic (LBE) are liquid metal coolants studied for 4th generation SMRs. There was a large focus on sodium during early work on large-rated reactors which has since carried over to SMRs to be a prominent choice as a liquid metal coolant. SMRs have lower cooling water requirements, which expands the number of sites where a SMR could be built, including remote areas typically incorporating mining and desalination.

Thermal/electrical generation Some gas-cooled reactor designs could drive a gas turbine, rather than boiling water, such that thermal energy can be used directly. Heat could also be used in hydrogen production and other industrial operations, such as desalination and the production of petroleum derivative (extracting oil from oil sands, making synthetic oil from coal, etc.).

Load following SMR designs are generally expected to provide base load electrical power; some proposed designs are aimed to adjust their power output based on electricity demand. Another approach, especially for SMRs designed to provide high temperature heat, is to adopt cogeneration, maintaining consistent heat output, while diverting otherwise unneeded heat to an auxiliary use. District heating, desalination and hydrogen production have been proposed as cogeneration options. Overnight desalination requires sufficient freshwater storage capacity to deliver water at times other than when it is produced. Reverse osmosis membrane and thermal evaporators are the two main techniques for seawater desalination. The membrane desalination process uses only electricity to power water pumps and is the most employed of the two methods. In the thermal process, the feed water stream is evaporated in different stages with continuous decreases in pressure between the stages. The thermal process directly uses thermal energy and avoids the conversion of thermal power into electricity. Thermal desalination is further divided into two main technologies: the multi-stage flash distillation (MSF) and the Multi-Effect Desalination (MED).

Nuclear safety

A report by the German Federal Office for the Safety of Nuclear Waste Management (BASE) considering 136 different historical and current reactors and SMR concepts stated: "Overall, SMRs could potentially achieve safety advantages compared to power plants with a larger power output, as they have a lower radioactive inventory per reactor and aim for a higher safety level especially through simplifications and an increased use of passive systems. In contrast, however, various SMR concepts also favour reduced regulatory requirements, for example, with regard to the required degree of redundancy or diversity in safety systems. Some developers even demand that current requirements be waived, for example in the area of internal accident management or with reduced planning zones, or even a complete waiver of external emergency protection planning. Since the safety of a reactor plant depends on all of these factors, based on the current state of knowledge it is not possible to state, that a higher safety level is achieved by SMR concepts in principle." Negative temperature coefficients in the moderators and the fuels keep the fission reactions under control, causing the reaction to slow as temperature increases. After the shutdown of a nuclear reactor, the reactor needs to be cooled continuously in order to dissipate decay heat. A loss of emergency cooling such as in the Fukushima nuclear accident and the Three Mile Island accident can result in a nuclear meltdown when the temperature in the reactor becomes too high. Since the initial decay heat is a fraction of the reactor operating power, the lower operating power of SMRs makes them much safer since less heat needs to be dissipated. Some SMR designs proposes cooling systems only based on thermoconvection – natural circulation – to eliminate cooling pumps that could break down. Convection can keep removing decay heat after reactor shutdown. However, some SMRs may need an active cooling system to back up the passive system, increasing cost. Some SMR designs feature an integral design of which the primary reactor core, steam generator and the pressurizer are integrated within the sealed reactor vessel. This integrated design allows for the reduction of a possible accident as contamination leaks could be contained. In comparison to larger reactors having numerous components outside the reactor vessel, this feature increases the safety by decreasing the risks of an uncontained accident. Some SMR designs also envisage to install the reactor and the spent-fuel storage pools underground.

Radioactive waste

New technology in nuclear waste recycling is promising safer and less expensive alternatives to today's methods. Known as partitioning and transmutation (P&T), this recycling and waste reducing process can reduce spent fuel to a smaller volume of waste with considerably less radiotoxicity. A chemical separation process is used in P&T to extract plutonium and minor actinides. A specially designed reactor is then used to perform the transmutation of transuranic elements (neptunium, plutonium, americium and curium). Fission is finally applied to safely destroy the remaining elements. P&T is believed to improve radioactive waste management due to the expected reduction in overall waste volume P&T creates. Even highly enriched uranium reactors, applying shorter fuel cycle technologies, are now recycling major and minor actinides without the need for high purification schemes. The method is now used by LWR fast reactors in France, India, Japan and the Russian Federation. Their waste requires no plutonium separation from the other actinides. Pyroprocessing spent fuel is currently under development for LWR fast reactors and now operational in India, the Russian Federation and the European Union. Because SMR technology is so new, P&T has yet to be used on the spent fuel these plants will create. However, it is likely to be an important recycling method for most SMRs as this technology develops. The back end of the nuclear fuel cycle for SMRs is a complex and contested issue that remains under debate. The quantity and radiotoxicity of the radioactive waste produced by SMRs depend primarily on their design and the corresponding fuel cycle. Because SMRs encompass a broad spectrum of nuclear reactor types, there is no simple answer to this issue. SMRs may include small light water reactors of the third generation, as well as small fast neutron reactors of the fourth generation. Some startup companies developing unconventional SMR prototypes often advocate waste reduction as a key advantage of their proposed solutions, and in some cases claim that their technology could eliminate the need for a deep geological repository to dispose of high-level and long-lived radioactive waste. This is particularly true for companies developing fast neutron reactors of the fourth generation, such as molten salt reactors and metal-cooled reactors, including the sodium-cooled fast reactor and lead-cooled fast reactor. Fast breeder reactors "burn" 235U (0.7% of natural uranium) as fuel, but they also convert fertile materials such as 238U (which makes up 99.3% of natural uranium) into fissile 239Pu. This newly produced plutonium can then be used as nuclear fuel. The traveling wave reactor proposed by TerraPower is designed to "burn" the fuel it breeds in situ, without requiring its removal from the reactor core or further reprocessing. Some SMR designs are based on the thorium fuel cycle, which is advocated by their promoters as a way to reduce the long-term radiotoxicity of waste compared to the uranium cycle. However, the thorium cycle also presents significant operational challenges due to the production and use of 232U and the long-lived fertile 233U, both of which emit strong gamma rays. As a result, the presence of these radionuclides complicates the radiation shielding of fresh nuclear fuel and the long-term storage and disposal of their spent nuclear fuel. A 2022 study by Krall, Macfarlane and Ewing took a more critical approach, reporting that certain types of SMRs could produce more waste per unit of output power than conventional reactors—sometimes more than five times the amount of spent nuclear fuel per kilowatt, and up to thirty-five times more waste generated by neutron activation, such as activated steel and graphite. The authors identified neutron leakage as a primary issue for SMRs, as these reactors have a higher surface-area-to-volume ratio than conventional reactors. They calculated that, in smaller reactor cores, neutron leakage rates are significantly higher because emitted neutrons are less likely to interact with fissile atoms in the fuel and induce fission. Instead, more neutrons escape the core and are absorbed by materials used in neutron reflectors and shielding (thermal and gamma shields), rendering these materials radioactive waste through neutron activation. Reactor designs using liquid metal coolants—such as molten sodium, lead, or lead-bismuth eutectic (LBE)—also become radioactive and contain activated impurities. Another issue pinpointed by Krall et al. (2022) related to higher neutron leakage in SMRs is that a lower fraction of their nuclear fuel is consumed, resulting in lower burnup and leaving more fissile material in their spent nuclear fuel, thereby increasing the waste volume. To sustain chain reactions in the smaller cores of SMRs, an alternative is to use nuclear fuel with a higher enrichment of 235U. This could increase the risks of nuclear proliferation and may require more stringent safeguard measures to prevent it (see also IAEA safeguards). If higher concentrations of fissile material remain in the spent fuel, the critical mass needed to sustain a nuclear chain reaction is also lower. As a direct consequence, the number of spent fuel assemblies present in a waste canister must also be lower, necessitating a larger number of canisters and overpacks (containment structures) to avoid criticality accidents and guarantee nuclear criticality safety in a deep geological repository. This also contributes to increased total waste volume and the number of disposal galleries needed in a geological repository. Given the potential technical and economic importance of SMRs in providing zero-carbon electrical energy for climate change mitigation, as well as the long-term and social relevance of managing and disposing of radioactive waste without imposing a negative burden on future generations, the publication of Krall et al. (2022) in the prestigious PNAS journal has attracted numerous responses. These range from criticisms regarding the quality of their data and hypotheses to international debates on radioactive waste generated by SMRs and their decommissioning. In an interview with François Diaz-Maurin, the associate editor of the Bulletin of the Atomic Scientists, Lindsay Krall—the lead author of the study and a former MacArthur postdoctoral fellow at Stanford's Center for International Security and Cooperation (CISAC)—addressed questions and criticisms, including those raised by the NuScale reactor company. One of Krall's main concerns in the interview was:

There's definitely a disconnect between the people working on the back end of the fuel cycle—especially with geologic repository development—and those actually designing reactors. And, there is not a lot of motivation for these reactor designers to think about the geologic disposal aspects because the NRC's new reactor design certification application does not have a chapter on geologic disposal... The high diversity of SMR reactors and their respective fuel cycles may also require more diverse waste management strategies to recycle or safely dispose of their nuclear waste. Managing a larger number of spent fuel types will be more challenging than the current situation, where most spent fuel comes from light water reactors. As Krall and Macfarlane stressed in a 2018 paper, some types of SMR spent fuels or coolants—such as highly reactive and corrosive uranium fluoride (UF4) from molten salt reactors or pyrophoric sodium from liquid metal-cooled fast breeders—cannot be directly disposed of in a deep geologic repository because of their chemical reactivity in underground environments (such as deep clay formations, crystalline rocks, or rock salt). To avoid exacerbating spent fuel storage and disposal issues, it will be necessary to reprocess and condition these materials in an appropriate and safe manner before final geological disposal. A study by Keto et al. (2022) at the VTT Technical Research Centre of Finland also addressed the management of spent nuclear fuel (SNF) and low- and intermediate-level waste (LILW) from the possible future deployment of SMRs in Finland. The study indicated that, per gigawatt-electric-year (GWe-year), larger masses of SNF and other high-level waste (HLW), as well as larger volumes of low-level waste (LLW), would be produced by a light water SMR compared to a large nuclear power plant. A report by the German Federal Office for the Safety of Nuclear Waste Management (BASE) found that extensive interim storage and fuel transports would still be required for SMRs. The report also concluded that a deep geological repository is unavoidable due to the presence of highly mobile, long-lived fission products that cannot be efficiently transmuted because of their low neutron cross section. This is the case with dose-dominating radionuclides such as 129I, 99Tc, and 79Se, which exist as soluble anions that are not sorbed onto the negatively charged minerals and are not retarded in geological media. Nuclear waste is regulated within the existing nuclear governance systems, originally designed for conventional nuclear reactors. In the United States, oversight of waste is coordinated through the US Nuclear Regulatory Framework Commission and US Department of Energy. SMRs produce broadly similar categories of waste as large reactors, however differences in deployment of scale, design, and use of SMR alters the transportation needs, logistics, and containment demands.

Nuclear proliferation Nuclear proliferation, or the use of nuclear materials to create weapons, is a concern for small modular reactors. As SMRs have lower generation capacity and are physically smaller, they are intended to be deployed in many more locations than conventional plants. SMRs are expected to substantially reduce staffing levels. The combination creates physical protection and security concerns. SMRs can be designed to use unconventional fuels allowing for higher burnup and longer fuel cycles. Longer refueling intervals could contribute to decrease the proliferation risks. Once the fuel has been irradiated, the mixture of fission products and fissile materials is highly radioactive and requires special handling, preventing casual theft. Contrasting to conventional large reactors, SMRs can be adapted to be installed in a sealed underground chamber; therefore, "reducing the vulnerability of the reactor to a terrorist attack or a natural disaster". New SMR designs enhance the proliferation resistance, such as those from the reactor design company Gen4. These models of SMR offer a solution capable of operating sealed underground for the life of the reactor following installation. Some SMR designs are designed for one-time fueling. This improves proliferation resistance by eliminating on-site nuclear fuel handling and means that the fuel can be sealed within the reactor. However, this design requires large amounts of fuel, which could make it a more attractive target. A 200 MWe 30-year core life light water SMR could contain about 2.5 tonnes of plutonium at end of life. Furthermore, many SMRs offer the ability to go periods of greater than 10 years without requiring any form of refueling therefore improving the proliferation resistance as compared to conventional large reactors of which entail refueling every 18–24 months. Light-water reactors designed to run on thorium offer increased proliferation resistance compared to the conventional uranium cycle, though molten salt reactors have a substantial risk. SMRs are transported from the factories without fuel, as they are fueled on the ultimate site, except some microreactors. This implies an independent transport of the fuel to the site and therefore increases the risk of nuclear proliferation. At the same time, millions of tons of nuclear waste are being shipped across the United States each year and there is no history of nuclear fuel or waste theft from these deliveries.

Licensing process Licensing is an essential process required to guarantee the safety and security of a new nuclear installation. The safety and feasibility cases of nuclear installations have to take into account all processes and elements important for the operational safety, its physical security, safeguards (risk of proliferation), the proper conditioning of radioactive waste, and the long-term safety related to the final disposal of the different types of radwaste produced, including all the waste produced during dismantling operations after decommissioning of the installation. A particularly important point of attention for the backend of the nuclear fuel cycle is to avoid to producing poorly conditioned waste, or waste types without sustainable final destination or susceptible to generating unexpected reprocessing and disposal costs. Licensing of reactor designs is commonly considered a potential barrier to SMR deployment. SMR designs encompass a broad range of reactor technologies and potential use cases. Many of these designs differ substantially from existing reactors. Accordingly, the licensing pathway for SMRs is highly design-dependent. The majority of existing reactors are large light-water reactors (LWRs), including pressurized water reactors and boiling water reactors. Existing licensing procedures are generally based around these large LWRs. These procedures can in many cases be directly applied to SMRs, particularly light-water designs similar to existing reactors. However, non-light-water designs, and SMRs with certain features such as autonomous operation, may encounter significantly more difficulty. In the United States, the Nuclear Regulatory Commission licenses nuclear power plants under two separate licensing pathways. The traditional process is a two-step pathway (Part 50), which involves a construction permit followed by an operating permit. A newer pathway, Part 52, involves a single, combined construction and operating license (COL), as well as an optional design certification process. While both pathways are technology-neutral, their supporting guidance is primarily designed for light-water reactors. In particular, the NRC's general design criteria is primarily geared towards light-water reactors. In response, the NRC and US Department of Energy developed a regulatory guide for developing design criteria for advanced reactors. The new guide was released in 2018. Other parts of the licensing process such as licensing fees and emergency planning zones, while not explicitly LWR-focused, may pose issues for SMRs. The IAEA has encouraged the creation of an international guidance for SMR licensing. A workshop in October 2009 and another in June 2010 considered the topic, followed by an US congressional hearing in May 2010. The NRC and the United States Department of Energy are working to define SMR licensing. The challenge of facilitating the development of SMRs is to prevent a weakening of the safety regulations: the risk of lightened regulations adopted more rapidly is to lower the safety characteristics of SMRs. The US Advanced Reactor Demonstration Program was expected to help license and build two prototype SMRs during the 2020s, with up to $4 billion of government funding. In July 2024, the ADVANCE Act directed the US NRC to develop a process to license and regulate microreactor designs. The Act is intended to expedite the deployment of microreactors, among other nuclear technologies. Many SMR designs intend to use multiple identical modules at a single site, controlled from a single control room. However, NRC regulations assume that at most two reactors are controlled from a single control room. This rule is based on existing large LWRs, while many SMR designs are considered safer and simpler to operate. The NRC expects, in the short term, to allow some SMRs to deviate from this rule via a regulatory exemption. In 2020, the NRC approved a design certification for NuScale's SMR that included 12 reactor modules controlled from a single control room. Similarly, some reactors propose highly or fully autonomous control, without human operators. Improved automation could significantly improve safety by reducing operational errors that lead to accidents. However, reactor designers will need to demonstrate sufficient