Peral was the first successful submarine powered entirely by electric batteries and the first fully military-capable submarine in history. It was built by the Spanish engineer and sailor Isaac Peral for the Spanish Navy at the Arsenal de la Carraca (now Navantia). The submarine was launched on 8 September 1888. She had one torpedo tube (and two torpedoes) and an air regeneration system. Her hull shape, propeller, periscope, torpedo launcher and cruciform external controls anticipated later designs. Her underwater speed was 3 knots (5.6 km/h; 3.5 mph). With fully charged batteries, she was the fastest submarine yet built. Although advanced in many ways, Peral lacked a means of charging batteries while underway, such as an internal combustion engine, thus had a very limited endurance and range. In June 1890, Peral's submarine launched a torpedo while submerged. It was also the first submarine to incorporate a fully reliable underwater navigation system. However, conservatives in the Spanish naval hierarchy terminated the project despite two years of successful tests. Her operational abilities have led some to call her the first U-boat. Peral was withdrawn from service in 1890 and is now preserved at the Cartagena Naval Museum.
Conception
Peral was first conceived on 20 September 1884, when Lieutenant Isaac Peral y Caballero wrote a paper which would become his Proyecto de Torpedero Submarino ("Project for a submarine torpedo boat"). After several studies and experiments, and having gained support from his superiors and fellow officers, Peral exposed his idea to the Spanish navy staff. He wrote a letter to the Spanish naval minister, Vice Admiral Pezuela y Lobo, in September, 1885. Pezuela called Peral to Madrid to have a personal interview with him. After the interview Pezuela agreed to finance Peral's preliminary studies in Cádiz with an initial budget of 5,000 pesetas, before launching a program to build a full-scale submarine.
The first study consisted of human breath test in an enclosure for several hours. A room of 58 m2 (620 ft2) square meters was used, with an air storage cell, loaded to 79 atmospheres and a storage capacity of 0.5 m3. In addition to instruments to measure the temperature and moisture, there was a tube to re-oxygenate the air supply to the crew through a 4 mm (0.16 in) waterproof cloak and three water buckets to maintain the moisture. Six people locked themselves inside the room; one had to leave an hour and quarter later, but the rest remained for a total of five hours, and the test was considered a total success. On 21 July 1886, the new Navy Minister, rear-admiral Beranger, decided that the project would be reviewed by the Centro Técnico de la Armada (Naval Technical Center), under the responsibility of Admiral Antequera. He considered a more complete study of the actuator necessary before undertaking the construction of the hull and the electric engine. He authorized Peral to carry out all the modifications that he thought worthwhile, granting him 25,000 pesetas. On 5 March 1887, Peral communicated that the electric motor or "depth's device", as he called it, was ready. On 17 March, the Commander in Chief of Cadiz, Florencio Montojo, who headed the technical committee overseeing the machine, requested budgeting for Peral's submarine.
Construction
… excerpt ends here. Continue reading the full article.


