ArticleslgStudy

science

Terminal Link

Terminal Link is a science topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Terminal Link rather than just read about it. In short: The Terminal Link, formerly known as the Link Train, is an automated people mover at Toronto Pearson International Airport in Mississauga, Ontario, Canada. The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride.

Terminal Link — main illustration
Terminal Link — illustration

Key takeaways

  • Terminal Link belongs to science; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Terminal Link to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Terminal Link from memory before moving on to harder problems.

Reference excerpt

The Terminal Link, formerly known as the Link Train, is an automated people mover at Toronto Pearson International Airport in Mississauga, Ontario, Canada. The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride. In 2012, it transported 17,000 passengers daily, 60 to 70% of whom were airport staff.

History The original proposal for an automated people mover system at Pearson Airport was submitted in May 2002. Six months later, on November 15, 2002, a CA$55-million contract was signed with DCC Doppelmayr Cable Car GmbH of Wolfurt, Austria, followed by four years of construction. The system opened to the public on July 6, 2006 at a cost of $150 million. The service initially operated alongside its predecessor, the Link shuttle bus system. On March 30, 2009, the Link Train was put out of service for extensive maintenance due to engineering design flaws. During this time, service was replaced by an inter-terminal shuttle bus. Normal service resumed in July 2009. On March 16, 2013, the Link Train was shut down for approximately eight months during construction of the Union Pearson Express. The trains were refurbished during this time and received a seventh car, new seats, and a new paint scheme.

Design and rolling stock The Terminal Link uses a pair of Cable Liner trains, each composed of seven permanently-coupled cars. They use a cable-hauled, drive and tension system. Each train has capacity for 175 passengers with baggage (25 per car: 17 standing, 8 seated) or 2,500 passengers per hour per direction (pphpd). The two trains, plus a small work car, cost a total of CA$56 million when delivered. They were refurbished in 2013, and received a new paint scheme, new seats, and a seventh car (they were originally delivered and used as six-car trains).

Stations and connections

The two fully elevated lines, running side-by-side, are 1.5 kilometres (0.9 mi) long, and have a one-way travel time of four minutes. They serve three stations: Terminal 1, Terminal 3, and Viscount (long-term parking on Airport Road). Each station consists of a single island platform, with platform screen doors separating the tracks.

The Union Pearson Express airport rail link service between Pearson Airport and Union Station in Downtown Toronto opened on June 6, 2015, in time for the 2015 Pan American Games. It directly serves Terminal 1 with its station integrated with the Terminal Link. A number of public transport bus services in the GTA have a stop on the lower level of Terminal 1; these include the Toronto Transit Commission (TTC), MiWay, Brampton Transit, and GO Transit. The TTC has an additional stop on the lower level at Terminal 3, served after departing Terminal 1. At Viscount station, connections to MiWay and Brampton Transit's Züm can be made. As originally proposed, Line 5 Eglinton was to connect Pearson Airport with Scarborough by 2018 as part of the Transit City plan. However, when the four Transit City lines were found to be $2.4 billion over their funding envelope in January 2010, parts of the network were deferred, including the western section of the Eglinton LRT. A future extension could eventually reach the airport, completing the line as envisioned. As of 2020, planning for the western extension is underway and Metrolinx hopes to complete the line by 2030–31.

Operations Both lines operate independently in shuttle mode with a total capacity of up to 2,180 pphpd. The trains run on rubber tires on a smooth steel surface and all propulsion is provided by the cable. The absence of onboard motors, braking systems and gearboxes eliminates excessive noise, oil spills from the trains, and dust from brakes. Doppelmayr asserts that a cable-driven APM is the most environmentally responsible solution for transportation in high density applications.

See also Union Pearson Express Transportation in Mississauga

References

External links

GTAA. "Link Train". Retrieved February 28, 2021. Doppelmayr Cable Car, designer's webpage Airport People Mover technical data Airport People Mover System Doppelmayr/Garaventa Group, parent company of DCC

Illustrations

Terminal Link illustration
Terminal Link: Terminal 3 station
Terminal 3 station
Terminal Link: Terminal Link train approaching Terminal 1 station in 2012, in old livery
Terminal Link train approaching Terminal 1 station in 2012, in old livery

Worked examples

Example 1 — a first encounter with Terminal Link

Start with the simplest possible case. Write down what Terminal Link claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In science, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Terminal Link before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Terminal Link ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Terminal Link

In research
Terminal Link appears in science research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Terminal Link in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Terminal Link is common in secondary-school and first-year university syllabi. It links to neighbouring topics 2006 establishments in Ontario, Airport people mover systems, Cable Liner people movers, so understanding it makes those chapters shorter.
In everyday life
Look for Terminal Link outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Terminal Link” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Terminal Link in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Terminal Link means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Terminal Link out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Terminal Link in simple terms?

The Terminal Link, formerly known as the Link Train, is an automated people mover at Toronto Pearson International Airport in Mississauga, Ontario, Canada. The wheelchair-accessible train runs 24 hours a day, seven days a week and is completely free-of-charge to ride.

Why does Terminal Link matter?

Because it connects several science ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Terminal Link?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Terminal Link.

Tags

  • 2006 establishments in Ontario
  • Airport people mover systems
  • Cable Liner people movers
  • Electric railways in Canada
  • Light rail in Canada
  • Passenger rail transport in Mississauga
  • People mover systems in Canada
  • Railway lines opened in 2006
  • Toronto Pearson International Airport
  • Transport in the Greater Toronto Area

Keep exploring