Tesla Dojo is a series of supercomputers designed and built by Tesla for computer vision video processing and recognition. It was used for training Tesla's machine learning models to improve its Full Self-Driving (FSD) advanced driver-assistance system. It went into production in July 2023. Dojo's goal was to efficiently process millions of terabytes of video data captured from real-life driving situations from Tesla's 4+ million cars. This goal led to a considerably different architecture than conventional supercomputer designs. In August 2025, Bloomberg News reported that the Dojo project had been disbanded, though it was restarted in January 2026.
History Tesla operates several massively parallel computing clusters for developing its Autopilot advanced driver assistance system. Its primary unnamed cluster using 5,760 Nvidia A100 graphics processing units (GPUs) was touted by Andrej Karpathy in 2021 at the fourth International Joint Conference on Computer Vision and Pattern Recognition (CCVPR 2021) to be "roughly the number five supercomputer in the world" at approximately 81.6 petaflops, based on scaling the performance of the Nvidia Selene supercomputer, which uses similar components. However, the performance of the primary Tesla GPU cluster has been disputed, as it was not clear if this was measured using single-precision or double-precision floating point numbers (FP32 or FP64). Tesla also operates a second 4,032 GPU cluster for training and a third 1,752 GPU cluster for automatic labeling of objects. The primary unnamed Tesla GPU cluster has been used for processing one million video clips, each ten seconds long, taken from Tesla Autopilot cameras operating in Tesla cars in the real world, running at 36 frames per second. Collectively, these video clips contained six billion object labels, with depth and velocity data; the total size of the data set was 1.5 petabytes. This data set was used for training a neural network intended to help Autopilot computers in Tesla cars understand roads. By August 2022, Tesla had upgraded the primary GPU cluster to 7,360 GPUs. Dojo was first mentioned by Elon Musk in April 2019 during Tesla's "Autonomy Investor Day". In August 2020, Musk stated it was "about a year away" due to power and thermal issues.
Dojo was officially announced at Tesla's Artificial Intelligence (AI) Day on August 19, 2021. Tesla revealed details of the D1 chip and its plans for "Project Dojo", a datacenter that would house 3,000 D1 chips; the first "Training Tile" had been completed and delivered the week before. In October 2021, Tesla released a "Dojo Technology" whitepaper describing the Configurable Float8 (CFloat8) and Configurable Float16 (CFloat16) floating point formats and arithmetic operations as an extension of Institute of Electrical and Electronics Engineers (IEEE) standard 754. At the follow-up AI Day in September 2022, Tesla announced it had built several System Trays and one Cabinet. During a test, the company stated that Project Dojo drew 2.3 megawatts (MW) of power before tripping a local San Jose, California power substation. At the time, Tesla was assembling one Training Tile per day. In August 2023, Tesla powered on Dojo for production use as well as a new training cluster configured with 10,000 Nvidia H100 GPUs. In January 2024, Musk described Dojo as "a long shot worth taking because the payoff is potentially very high. But it's not something that is a high probability." In June 2024, Musk explained that ongoing construction work at Gigafactory Texas is for a computing cluster claiming that it is planned to comprise an even mix of "Tesla AI" and Nvidia/other hardware with a total thermal design power of at first 130 MW and eventually exceeding 500 MW. In August 2025, Bloomberg News reported that the Dojo project was disbanded, although it was restarted in January 2026 with a new chip iteration.
Technical architecture The fundamental unit of the Dojo supercomputer is the D1 chip, designed by a team at Tesla led by ex-AMD CPU designer Ganesh Venkataramanan, including Emil Talpes, Debjit Das Sarma, Douglas Williams, Bill Chang, and Rajiv Kurian. The D1 chip is manufactured by the Taiwan Semiconductor Manufacturing Company (TSMC) using 7 nanometer (nm) semiconductor nodes, has 50 billion transistors and a large die size of 645 mm2 (1.0 square inch). Updating at Artificial Intelligence (AI) Day in 2022, Tesla announced that Dojo would scale by deploying multiple ExaPODs, in which there would be:
10 Cabinets per ExaPOD (1,062,000 cores, 3,000 D1 chips) 2 System Trays per Cabinet (106,200 cores, 300 D1 chips) 6 Training Tiles per System Tray (53,100 cores, along with host interface hardware) 25 D1 chips per Training Tile (8,850 cores) 354 computing cores per D1 chip
According to Venkataramanan, Tesla's senior director of Autopilot hardware, Dojo will have more than an exaflop (a million teraflops) of computing power. For comparison, according to Nvidia, in August 2021, the (pre-Dojo) Tesla AI-training center used 720 nodes, each with eight Nvidia A100 Tensor Core GPUs for 5,760 GPUs in total, providing up to 1.8 exaflops of performance.
D1 chip Each node (computing core) of the D1 processing chip is a general purpose 64-bit CPU with a superscalar core. It supports internal instruction-level parallelism, and includes simultaneous multithreading (SMT). It doesn't support virtual memory and uses limited memory protection mechanisms. Dojo software/applications manage chip resources.
The D1 instruction set supports both 64-bit scalar and 64-byte single instruction, multiple data (SIMD) vector instructions. The integer unit mixes reduced instruction set computer (RISC-V) and custom instructions, supporting 8, 16, 32, or 64 bit integers. The custom vector math unit is optimized for machine learning kernels and supports multiple data formats, with a mix of precisions and numerical ranges, many of which are compiler composable. Up to 16 vector formats can be used simultaneously.
… excerpt ends here. Continue reading the full article.