ArticleslgStudy

engineering

Ukishima Solar Power Plant

Ukishima Solar Power Plant is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Ukishima Solar Power Plant rather than just read about it. In short: The Ukishima Solar Power Plant (Japanese: 浮島太陽光発電所) is a 7 MW solar photovoltaic power station located on the waterfront in Kawasaki. It is the first solar plant built by Tepco, and was completed on August 10, 2011.

Key takeaways

  • Ukishima Solar Power Plant belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Ukishima Solar Power Plant to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Ukishima Solar Power Plant from memory before moving on to harder problems.

Reference excerpt

The Ukishima Solar Power Plant (Japanese: 浮島太陽光発電所) is a 7 MW solar photovoltaic power station located on the waterfront in Kawasaki. It is the first solar plant built by Tepco, and was completed on August 10, 2011. In the first year of operation, it produced 9,453 MWh, a capacity factor of 0.15, which was about 30% greater than anticipated. An unusual feature of the plant is that the panels are mounted at a fixed angle of 10°, instead of the 30°, which would normally be considered optimal for this latitude.

See also

Komekurayama Solar Power Plant Ogishima Solar Power Plant Solar power in Japan

References

Worked examples

Example 1 — a first encounter with Ukishima Solar Power Plant

Start with the simplest possible case. Write down what Ukishima Solar Power Plant claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Ukishima Solar Power Plant before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Ukishima Solar Power Plant ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Ukishima Solar Power Plant

In research
Ukishima Solar Power Plant appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Ukishima Solar Power Plant in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Ukishima Solar Power Plant is common in secondary-school and first-year university syllabi. It links to neighbouring topics 2011 establishments in Japan, Buildings and structures in Kawasaki, Kanagawa, Energy infrastructure completed in 2011, so understanding it makes those chapters shorter.
In everyday life
Look for Ukishima Solar Power Plant outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Ukishima Solar Power Plant” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Ukishima Solar Power Plant in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Ukishima Solar Power Plant means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Ukishima Solar Power Plant out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Ukishima Solar Power Plant in simple terms?

The Ukishima Solar Power Plant (Japanese: 浮島太陽光発電所) is a 7 MW solar photovoltaic power station located on the waterfront in Kawasaki. It is the first solar plant built by Tepco, and was completed on August 10, 2011.

Why does Ukishima Solar Power Plant matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Ukishima Solar Power Plant?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Ukishima Solar Power Plant.

Tags

  • 2011 establishments in Japan
  • Buildings and structures in Kawasaki, Kanagawa
  • Energy infrastructure completed in 2011
  • Japanese building and structure stubs
  • Photovoltaic power stations in Japan
  • Power station stubs
  • Renewable power plant stubs
  • Tokyo Electric Power Company

Keep exploring