Water privatization in Bucharest

Water privatization in Bucharest is a engineering topic covered in the lgStudy science library. This page brings together a partial reference excerpt, illustrations, worked examples, real-world applications and a short study plan, so you can understand Water privatization in Bucharest rather than just read about it. In short: The water and sewer system of Bucharest (Bucuresti in Romanian), the capital of Romania with a population of 2.3 million, was privatized in 2000 through a 25-year concession to the French company Veolia. The impact of the concession is mixed.

Water privatization in Bucharest — main illustration
Water privatization in Bucharest — illustration

Key takeaways

  • Water privatization in Bucharest belongs to engineering; place it in that map before memorising details.
  • Learn the definition first, then one example that makes the definition concrete.
  • Connect Water privatization in Bucharest to a quantity you can measure, compute or draw — that is where exam questions come from.
  • Reproduce the core statement of Water privatization in Bucharest from memory before moving on to harder problems.

Reference excerpt

The water and sewer system of Bucharest (Bucuresti in Romanian), the capital of Romania with a population of 2.3 million, was privatized in 2000 through a 25-year concession to the French company Veolia. The impact of the concession is mixed. During the first years almost 3,000 employees were laid off and water bills increased four-fold. There were improvements in service quality and efficiency, but most of the improvements occurred before privatization and improvements in service quality since privatization are not well documented. Privatization placed the burden of financing the renewal of the infrastructure directly on water consumers rather than on taxpayers. The private water utility owned by Veolia, Apa Nova București (Bucharest New Water), is considered one of the most profitable Romanian utilities.

Situation before privatization

Various reports paint contrasting pictures of the situation before privatization. A publicly available internal technical report by the World Bank before privatization and a World Bank publication written for public dissemination after privatization differ in their assessment of when improvements occurred. According to the paper for the wider public, before privatization "water supply was intermittent, pressure was low, quality fell short of standards, and there were outbreaks of waterborne disease." According to the internal report, performance improved substantially between 1996 and 1999 before privatization under public management. Reported pressure problems decreased by 30 percent, complaints decreased by 20 percent, billing efficiency (the share of bills collected of the bills issued) increased from 80 to 92 percent, the share of metered residential connections increased from 50 to 91 percent, water availability increased from 12 hours to close to 24 hours per day, specific energy consumption decreased by 25 percent, and water losses – or more precisely non-revenue water – decreased from 45 to 35 percent, all before the privatization. The World Bank had supported the public utility through a US$25 million loan and evaluated the outcome of its project as satisfactory. However, according to some estimates the system still needed more than US$1 billion in investment. Neither the municipality nor the national government was able to finance an investment of this size.

Prelude to privatization In August 1997 the municipal government decided to bring the city's water system under some form of private management and approached the International Finance Corporation (IFC), the private-sector arm of the World Bank Group, for advice. A permanent sale of assets was ruled out by the government. Instead various forms of public-private partnerships were considered, ranging from a short-term lease or management contract with little or no private investment to a long-term concession under which the private operator was to finance all capital investments. Under all options the ownership of the infrastructure was to remain with the municipality. The IFC was paid through a relatively small retainer fee and a success fee. The latter provided an incentive in favor of the concession model. It was to be highest, at US$2.5 million, if the privatization was in the form of a concession, lower if it was in the form of a lease contract, and lowest for management contract. The IFC advised in favor of a concession contract, which was accepted by the municipality. At the time it was also considered whether the service area should be split in two halves, with two contracts to be awarded to separate companies each serving one part of the city. This arrangement had earlier been applied in Paris and in Manila, in order to allow to compare the performance of the operators (benchmarking). In Bucharest the city opted for retaining a single service area. The city also decided that it would retain shares in the new company. It contributed its share through the transfer of its fixed assets. The municipal share in the company is variously quoted as 20 percent or 14 percent, compared to a level of 31 percent that had apparently been envisaged initially. The decision to privatize was taken by the municipal council with a majority of 51 from 60 votes. In parallel, a public relations campaign was carried out in the media, based on analysis from surveys and focus group discussions, in order to win support for the privatization.

Tender and contract award The selection of the private operator was carried out by the municipality, not by the national government. Only a single criterion was used to select the winning bidder among six short-listed companies: the lowest average water tariff over the 25-year concession contract. Three bids were received from Veolia (France), Suez Environnement (France) and International Water (UK). The bids were opened and evaluated on the same day in a public meeting in the presence of the media, allowing for a high level of transparency. The tender was won by Veolia which submitted an average tariff of only US$0.17 per cubic meter, with tariffs until year 16 discounted to their present value. This compared to an initial tariff of $0.18 per cubic meter. The water tariff submitted by Veolia was very low compared to other European countries. For example, the water and sewer tariff was seven times lower than in Athens ($1.34 per cubic meter) and more than 20 times lower than in Germany ($3.95 per cubic meter). In March 2000 the concession contract was signed between the municipality and the Veolia subsidiary Apa Nova București.

Financing Apa Nova received concessionary financing from multilateral and bilateral development banks, including two loans for the new Crivina water treatment plant from the EBRD (EUR 55.4 m) and the German DEG (EUR 18.5m). Veolia also provided EUR 35 million in equity. The bulk of the US$340 million investments in the 2000–2007 period were, however, financed through commercial loans and, indirectly, by customers through the company's retained earnings.

… excerpt ends here. Continue reading the full article.

Worked examples

Example 1 — a first encounter with Water privatization in Bucharest

Start with the simplest possible case. Write down what Water privatization in Bucharest claims or describes in one sentence, then invent the smallest concrete situation in which that sentence is true. In engineering, the smallest case is usually a single object, a single equation or a single measurement. Check that every symbol or term in your sentence has a meaning in that case.

Example 2 — changing one variable

Take the situation from Example 1 and change exactly one quantity: double it, halve it, or set it to zero. Predict what should happen to Water privatization in Bucharest before you calculate. Comparing your prediction with the result is the fastest way to find out whether you understand the idea or only the words.

Example 3 — an exam-style question

Typical questions about Water privatization in Bucharest ask you to (a) state it precisely, (b) apply it to given data, and (c) explain a limitation. Practise writing all three answers in under five minutes; the third part is what separates a full-mark answer from an average one.

Applications of Water privatization in Bucharest

In research
Water privatization in Bucharest appears in engineering research whenever the underlying quantities have to be modelled precisely. Papers usually cite it as a starting assumption and then explore where it breaks down.
In technology and industry
Engineering practice reuses Water privatization in Bucharest in design rules, simulations and safety margins. Knowing the idea lets you read a specification sheet and understand why the numbers look the way they do.
In the classroom
Water privatization in Bucharest is common in secondary-school and first-year university syllabi. It links to neighbouring topics Government of Romania, Infrastructure in Bucharest, Privatization in Romania, so understanding it makes those chapters shorter.
In everyday life
Look for Water privatization in Bucharest outside the textbook — in sport, cooking, traffic, electronics or the sky above you. An example you found yourself is remembered far longer than one you were given.
Ask Teacher Smith questions about this articleOpens your AI tutor with a question about “Water privatization in Bucharest” →

Affiliate

Preply — study more efficiently by working with a personal tutor. 50% off.

How to study Water privatization in Bucharest in 20 minutes

  1. Read the reference excerpt below once, without taking notes.
  2. Close the page and write down what Water privatization in Bucharest means in your own words.
  3. Compare your version with the excerpt and mark what you missed.
  4. Work through the three examples above with pen and paper.
  5. Explain Water privatization in Bucharest out loud to somebody else — or to Teacher Smith in the lgStudy chat.

Frequently asked questions

What is Water privatization in Bucharest in simple terms?

The water and sewer system of Bucharest (Bucuresti in Romanian), the capital of Romania with a population of 2.3 million, was privatized in 2000 through a 25-year concession to the French company Veolia. The impact of the concession is mixed.

Why does Water privatization in Bucharest matter?

Because it connects several engineering ideas at once: it gives you a definition you can apply, a quantity you can calculate, and a way to check whether a result is plausible.

How should I study Water privatization in Bucharest?

Read the excerpt, restate it from memory, then work through the examples and applications listed on this page. The five-step study plan above takes about twenty minutes.

What does this page cover?

It gives you a compact reference excerpt plus original lgStudy explanations, examples, applications and study material on Water privatization in Bucharest.